A Calculation Method for Settlement of Capped Pile Composite Foundation
A composite foundation and calculation method technology, applied in the field of civil engineering, can solve problems such as difficulty, difficulty in accurately calculating the pile-soil stress ratio, neglect of pile-soil interaction, etc., achieving strong practicability, reducing the number of calculation parameters, and improving accuracy. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0069] Taking a new expressway as an example, the thickness of the subgrade fill is 4m, and the thickness of the cushion is 0.3m; Figure 5 It is a geological schematic diagram of the soil layer under the subgrade. The soil layer under the subgrade is mainly composed of silt and silt soil. The silt downward is followed by residual sandy cohesive soil, fully weathered migmatite, sandy strongly weathered migmatite and fragmented block. Strongly weathered migmatite, Table 1 shows the geological parameters of the soil layer under the subgrade obtained from the site survey;
[0070] Table 1 Geological parameters of soil layer under subgrade
[0071]
[0072] Image 6 The settlement calculation model of the present invention includes three parts: cushion layer, reinforcement area and substratum. According to the settlement calculation model, the total settlement s of the composite foundation with cap piles is the sum of the settlements within the range of settlement calculation...