Mounting tool for multiple rows of reinforcing steel bars of frame beam and implementation method
A technology of installation tools and implementation methods, applied in the processing of building materials, construction, building construction, etc., can solve the problems of affecting structural safety, easy dislocation of steel bars, high risk, etc., saving manpower and material resources, and reducing safety risks. , The effect of using materials is simple
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Such as Figure 1 to Figure 3 As shown, the present invention is an installation tool for a frame beam with multiple rows of ribs, which includes several tool units, and the tool unit includes two pull rods 1 arranged in parallel at intervals, the top of each pull rod 1 is set as a hook, and the bottom is fixedly arranged There are circular rings 3, and rollers 2 are arranged in the two circular rings 3 at the bottom of the two pull rods 1 .
[0024] In this embodiment, the pull rod 1 is made of Φ16 threaded steel.
[0025] In this embodiment, the ring 3 is made of Φ10 round steel with an inner diameter of 32mm.
[0026] In this embodiment, the roller 2 is a steel pipe of DN25.
Embodiment 2
[0028] A kind of implementation method of the installation tool of frame beam with multiple rows of ribs described in Embodiment 1 of the present invention, the steps are as follows:
[0029] 1. First cut off several Φ16 rebars according to the total length of 60mm longer than the distance between the gluten of the frame beam in the construction drawing of the engineering structure and the second or third row of rebars, and then bend one end of each Φ16 rebar into a 60mm length The hook is used as a hanging rod 1, and the other end of each hanging rod 1 is welded firmly with a ring 3 with an inner diameter of 32mm made of φ10 round steel; pair every two hanging rods 1, and then connect one with a length slightly longer than The DN25 steel pipe with beam width passes through each paired two rings 3 as a roller 2, and is combined into several tool units;
[0030] 2. According to the length of the frame beam, hang the hanging rods 1 of each tool unit on the corner ribs 5 of the u...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com