A paver for municipal engineering construction and its construction method
A paver and engineering technology, applied in construction, road, road repair, etc., can solve the problems of heavy workload of floor tiles, many uncertain factors of manual laying, and a large amount of labor
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0037] refer to Figure 1-7 , a paver for municipal engineering construction is proposed in this embodiment, body 1, an installation box 2 is fixedly installed on one side of the body 1, and an inclined panel 4 is fixedly installed on the bottom inner wall of the installation box 2. The characteristics of the panel 4 make it easy to slide the floor tiles onto the conveying rollers 5. There are a plurality of conveying rollers 5 rotated at equal intervals in the installation box 2, and a discharge hole is opened on the bottom inner wall of one side of the installation box 2, and multiple conveying rollers The rollers 5 are all located on one side of the inclined plate 4, and both sides of the inclined plate 4 are fixedly installed with a coaming plate 6. The coaming plate 6 can be used to limit the position of the floor tiles, so as to avoid the position deviation of the floor tiles. Multiple conveying rollers 5 are connected by mutual transmission, and the mounting box 2 is fi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com