Starting process of pilot shaft type vertical shaft heading machine
A technology for roadheaders and shafts, which is applied in the field of starting technology of guide shaft shaft heading machines, and achieves the effect of reducing the starting cost and high safety factor
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0030] The starting process of the guide shaft type shaft boring machine includes two major steps: the preparation work before the shaft boring machine enters the well and the starting work of the shaft boring machine. The preparation work before the shaft boring machine entering the well is carried out before the starting work of the shaft boring machine.
[0031] The preparation work before the shaft boring machine enters the well includes the following steps...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


