Segmented dry connection method for prefabricated cover beam
A technology of covering beams and dry joints, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problem of slow speed and achieve the effect of fast loading and unloading
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0026] see Figure 1 to Figure 5 , a prefabricated cover beam segmental dry connection method, the specific steps are:
[0027] Step a: apply adhesive on the end of segment 1; in step a, when applying the adhesive, the thickness of the adhesive is controlled at 2.5 mm, and at the same time, in order to prevent the adhesive from blocking the channel 6, the adhesive Keep a distance of at least 3 cm from the outer edge of the tunnel 6.
[0028] Step b: use the hoisting device to lift the segment 1, and attach the end of the segment 1 coated with adhesive to the cantilever segment 2 of the cover beam;
[0029] Step c: set two top prestressed tendons 3 on the upper side of the cantilever section 2 of the cover beam, set one side prestressed tendon 4 on the left and right sides of the cantilever section 2 of the cover beam, and connect one end of the top prestressed tendons 3 On the cantilever section 2 of the cover beam, the other end of the top prestressed tendon 3 is connected ...