Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method of flexible connection structure of prefabricated part and building main body

A technology of building main body and prefabricated components, which is applied in the direction of building structure, building, building components, etc., can solve the problems of flexible connection failure, the decline of the function of flexible connection structure, and the easy displacement of prefabricated components and building main body, etc., to achieve further reduction The effect of the risk of displacement

Inactive Publication Date: 2021-08-27
张明明
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, in the prior art, during the construction of the flexible connection between the prefabricated components and the main body of the building, a flexible connection structure is simply added between the prefabricated components and the main body of the building, but the flexible connection structure and the prefabricated components and the main body of the building are all in a state of fit. , after a long building period, the displacement between the prefabricated components and the building body is prone to occur, which will lead to the decline of the function of the flexible connection structure, and even the detachment of the flexible connection structure, resulting in the failure of the flexible connection

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of flexible connection structure of prefabricated part and building main body
  • Construction method of flexible connection structure of prefabricated part and building main body
  • Construction method of flexible connection structure of prefabricated part and building main body

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0037] see Figure 1-6 As shown, a construction method of a flexible connection structure between a prefabricated component and a building body, the construction method includes the following construction steps:

[0038] S1: During building construction, a secondary structure will be built inside the main body 2 of the building. In order to facilitate the construction of the secondary structure, prefabricated components 1 will be used. The internal setting reinforcement;

[0039] S2: Then install flexible connecting plates 4 at both ends of the formed prefabricated component 1 to form a combined prefabricated panel, and when pouring the main body of the building 2, it is necessary to open installation slots 3 at both ends of the position where the combined prefabricated panel is installed;

[0040] S3: Use a hoist to lift the combined prefabricated panel in S2, and move it to the position of installation slot 3, adjust the combined prefabricated panel at an inclination, and t...

Embodiment 2

[0052] see Figure 7 and Figure 8 As shown in Comparative Example 1, another embodiment of the flexible connecting plate is that the flexible connecting plate 4 in this construction method may also include a second fixed plate 49, a second movable plate 410 and a second adjustment mechanism 411 The side of the second fixed plate 49 is provided with a second adjustment groove; the inside of the second adjustment groove is slidably connected to the second movable plate 410; the number of the second movable plate 410 is two, and they are arranged symmetrically; A prefabricated component is provided between the two second movable plates 410; a second adjusting mechanism 411 is evenly arranged between the second fixed plate 49 and the second movable plate 410; the second adjusting mechanism 411 includes a first A guide block 412, a second guide block 413 and a first spring 414; the first guide block 412 is fixedly connected with the first fixed plate 41; the second guide block 41...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of fabricated building industrialization, in particular to a construction method of a flexible connection structure of a prefabricated part and a building main body. Flexible connection plates are mounted at two ends of a formed prefabricated part to form a combined prefabricated plate, mounting slots are formed at two ends of the position where the combined prefabricated plate is mounted when the building main body is poured, and then the two ends of the combined prefabricated plate are inserted into the corresponding mounting slots. Comprehensive flexible connection between the building main body and the prefabricated part is effectively achieved, meanwhile, foundation limiting is conducted on the prefabricated part, when dislocation occurs between the prefabricated part and the building main body, the dislocation can be limited within the design range, and the problem that under the earthquake condition, large-amplitude dislocation sliding between the prefabricated part and the building main body occurs, even the prefabricated part is separated from the building main body, consequently, the prefabricated part falls down and hits people at the bottom is avoided.

Description

technical field [0001] The invention relates to the field of prefabricated building industrialization, in particular to a construction method for a flexible connection structure between a prefabricated component and a building main body. Background technique [0002] In self-built houses, prefabricated panels are often used. Since the formed prefabricated panels can be directly placed inside the main structure, it is more convenient and quick, so the effective connection between these formed parts of prefabricated panels and the main body of the building is very important. [0003] According to CN110206160A a kind of construction method of the flexible connection structure of prefabricated components and building main body, this invention has realized the flexible connection of prefabricated components (such as prefabricated kitchen, prefabricated toilet, etc.) The influence of the rigidity of the main body of the building, the construction is convenient, and it has broad ap...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B1/38E04B1/61E04B1/98E04H9/02
CPCE04B1/38E04B1/6108E04B1/98E04H9/021
Inventor 张明明宋凯王豪闫华俊李洪涛
Owner 张明明
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products