District development and construction fund full-period digital measurement and calculation model and device, storage medium and electronic equipment
A full-cycle, capital-based technology, applied in the field of the full-cycle digital calculation model of development and construction funds in the area, can solve the problem of huge iterative calculation workload and other issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited by the embodiments set forth herein. Rather, these embodiments are provided for more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0036] This embodiment is implemented based on electronic equipment, such as computer equipment. The electronic equipment includes a memory, a processor, and a computer program stored on the memory and operable on the processor. When the processor executes the program, as figure 1 As shown, the following full-cycle digital calculation model for development and construction funds of the area is realized, including:
[0037] Read the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


