Tunnel long-term settlement deformation-time prediction method

A prediction method and tunnel technology, applied in vehicle testing, machine/structural component testing, measuring devices, etc., can solve problems such as side wall water and mud inrush, tunnel roof sinking, and large monitoring errors

Active Publication Date: 2021-09-14
CCCC TUNNEL ENG +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In existing life, due to the increase of traffic pressure, excavating tunnels and constructing urban subways have become an important way to relieve traffic pressure. The concealment of tunnels and urban subways is relatively large, and the geological conditions during construction are complex, and the potential accident risks cannot be predicted. , and for the sudden accidents of tunnels and subways, the main manifestations are the collapse of the vault and the water and mud on the side wall. There are many methods to control the settlement of the tunnel vault. At present, in tunnel construction, the problem of tunnel roof subsidence is common. , the subsidence of the vault in the tunnel may cause major safety risks or accidents in the tunnel and surrounding construction facilities
At present, the method of detecting settlement of tunnels mainly adopts manual detection of total station. However, the detection of total station requires manual point-by-point detection, which is time-consuming and labor-intensive, and cannot be detected in real time. At the same time, the detection accuracy is related to the operation of the staff. , resulting in larger monitoring errors and lower monitoring accuracy

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunnel long-term settlement deformation-time prediction method
  • Tunnel long-term settlement deformation-time prediction method
  • Tunnel long-term settlement deformation-time prediction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The following will be combined with Figure 1-Figure 5 The present invention is described in detail, and the technical solutions in the embodiments of the present invention are clearly and completely described. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0041] A long-term settlement deformation-time prediction method of a tunnel, capable of monitoring a tunnel with an ultra-long linear structure composed of multiple structural segments, with high measurement accuracy and wide application range; comprising the following steps:

[0042] Step 1: Select the monitoring point and preset the automatic monitoring device for settlement deformation.

[0043]According to the engineering geological con...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A tunnel long-term settlement deformation-time prediction method comprises the following steps: 1, a monitoring point is selected, and an automatic settlement deformation monitoring device is preset; 2, a prediction system is initialized; 3, the prediction system automatically monitors settlement deformation; 4, a controller CPU analyzes and processes the monitoring data; and 5, a cloud server establishes an actual settlement deformation curve and generates a predicted settlement deformation curve. According to the tunnel long-term settlement deformation-time prediction method, a tunnel which is composed of a plurality of structural sections and is of an ultra-long linear structure can be monitored, the accuracy of the measurement result is high, and the application range is wide.

Description

technical field [0001] The invention relates to the technical field of tunnel detection equipment, in particular to a method for predicting tunnel long-term settlement deformation-time. Background technique [0002] In existing life, due to the increase of traffic pressure, excavating tunnels and constructing urban subways have become an important way to relieve traffic pressure. The concealment of tunnels and urban subways is relatively large, and the geological conditions during construction are complex, and the potential accident risks cannot be predicted. , and for the sudden accidents of tunnels and subways, the main manifestations are the collapse of the vault and the water and mud on the side wall. There are many methods to control the settlement of the tunnel vault. At present, in tunnel construction, the problem of tunnel roof subsidence is common. , the subsidence of the vault in the tunnel may cause major safety risks or accidents in the tunnel and surrounding con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01C5/00G01B21/32G01M17/007G01K13/00G01K1/024G08C17/02
CPCG01C5/00G01B21/32G01M17/007G01K13/00G01K1/024G08C17/02Y02P90/02
Inventor 崔达张永杰邱斌黄思凝
Owner CCCC TUNNEL ENG