Tunnel long-term settlement deformation-time prediction method
A prediction method and tunnel technology, applied in vehicle testing, machine/structural component testing, measuring devices, etc., can solve problems such as side wall water and mud inrush, tunnel roof sinking, and large monitoring errors
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] The following will be combined with Figure 1-Figure 5 The present invention is described in detail, and the technical solutions in the embodiments of the present invention are clearly and completely described. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0041] A long-term settlement deformation-time prediction method of a tunnel, capable of monitoring a tunnel with an ultra-long linear structure composed of multiple structural segments, with high measurement accuracy and wide application range; comprising the following steps:
[0042] Step 1: Select the monitoring point and preset the automatic monitoring device for settlement deformation.
[0043]According to the engineering geological con...