Prefabricated guide wall and secant pile construction technology using same

A construction technology, technology of occlusal piles, applied in sheet pile walls, foundation structure engineering, construction, etc., can solve problems that do not conform to the advanced concept of green construction, complicated construction process of occlusal piles, high labor intensity of workers, etc., and achieve simple demolition process Convenience, short construction period, and low production cost

Inactive Publication Date: 2021-10-22
福建东寰建设有限公司
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The construction process of occlusal piles is relatively complicated. The construction process mainly includes the construction of guide walls, mud preparation and treatment, fabrication and hoisting of steel cages, underwater concrete pouring, etc. Among them, the construction of guide walls is a key process to ensure the verticality of occlusal piles and the quality of piles. One; the guide wall is an indispensable structure in the construction of occlusal piles. Its main function is to protect the opening, support the load of construction equipment, and ensure the verticality of the occlusal pile casing. Most of the existing guide walls are cast-in-situ structures or The steel structure, the cast-in-place guide wall has the advantages of high rigidity and good integrity, but there are problems of high production cost, high labor intensity of workers, and it is difficult to dismantle. The steel structure has the advantages of high rigidity and good integrity. At the same time, the labor cost and labor intensity are smaller than those of cast-in-place structures, but because the cost of steel materials is much higher than that of cast-in-place structures, it does not conform to the advanced concept of green construction; therefore, it needs to be improved

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated guide wall and secant pile construction technology using same
  • Prefabricated guide wall and secant pile construction technology using same
  • Prefabricated guide wall and secant pile construction technology using same

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0033] Example: Please refer to Figure 1 ~ 5 This embodiment provides a construction process using the bite pile of the above prefabricated wall, including the following steps:

[0034] Step S1: Flat processing on the construction site, and measure the pile position according to the actual design data;

[0035] Step S2: Improve the wall trench according to the actual design data, and install a prefabricated wall in the wall trench, the way the prefabricated wall is installed includes: according to the actual design data, multiple wall members passing multiple wall components within the wall trench The glow groove and splicing block are attached up and down until the actual design height, the plurality of guide wall members are spliced ​​together by penetrating the connecting fittings in the first mounting hole and the second mounting hole until the actual design width; Forming the space that can be mounted, the number of wall trenches is two, and there is a prefabricated guide in ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of building construction, and discloses a prefabricated guide wall and a secant pile construction technology using the same. The prefabricated guide wall comprises a plurality of guide wall components, the top of each guide wall component is provided with a splicing groove, the bottom surface of each guide wall component is provided with a splicing block, first mounting holes penetrating through the groove walls of the corresponding sides of each splicing groove are formed in the groove walls of the two sides of each splicing groove of each guide wall component, and second mounting holes penetrating through each splicing block are formed in the side walls of each splicing block of each guide wall component. The secant pile construction technology further comprises the following steps that a site is leveled, and pile position measurement points are placed; a guide wall groove is excavated, a pre-guide wall is installed, the center point of a pile body is remeasured, a drilling machine is centered in place, a first section of sleeve and a second section of sleeve are hoisted and placed, a reinforcement cage is hoisted and placed in the first section of sleeve and the second section of sleeve, concrete is poured, a secant pile is manufactured, the prefabricated guide wall is recycled, and earthwork backfilling is conducted. The prefabricated guide wall has the characteristics of low manufacturing cost, simple and convenient dismounting process and flexibility in use.

Description

Technical field [0001] The present invention relates to the field of building construction technology, and more particularly to a prefabricated wall and a seminar construction process using the prefabricated wall. Background technique [0002] As a new type of pile, the bite pile has achieved better results in some urban subway construction, which effectively solves the short-resistant problem of traditional double-row pile, miraculous pile and other piles, which has waterproof effect. The advantages of small environmental impact, low quality and low quality; the bite pile enclosure is a structure similar to the ground continuous wall formed by the concrete piles, which can be used as a structure of the support soil as a waterproof curtain. For the selection of the pile material, it can be reinforced concrete, or it is also used in the use of concrete and reinforced concrete, and the bite pile is characterized by mutual biting between the piles and the piles, thereby forming a wh...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/38E02D5/20
CPCE02D5/38E02D5/20
Inventor 倪行寿卢尚智罗华锖王烨岳勇飞邵永辉胡礼伟周应晖蔡志强肖舒扬王继宝李晨亮
Owner 福建东寰建设有限公司