Method for synchronous construction of road base and inspection well
A road base, synchronous construction technology, applied in the direction of roads, roads, infrastructure projects, etc., can solve the problems of long construction time, construction period compression, violation of roadbed engineering, etc., to improve construction efficiency, shorten construction period, and simplify construction. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.
[0028] refer to figure 1 , a method for simultaneous construction of a road base and an inspection well, comprising the steps of:
[0029] S1 making reinforced concrete well circle integrated slab formwork;
[0030] 1) A round hole is reserved in the center of the top side of the template;
[0031] 2) Put the narrow ring buckle of the finished well ring in the round hole;
[0032] 3) Bind steel bars and pour concrete around the round hole;
[0033] 4) After the strength reaches the standard, the formwork is removed to obtain a reinforced concrete well ring integrated plate;
[0034] S2 inspection well foundation and well body;
[0035] The inspection well founda...