Alarm processing method and device
A processing method and early warning technology, applied in the field of communication, can solve problems such as waste of resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0087] Example 1: Node A and Node B, Node B and Node C, and Node C and Node D belong to the same PM path segment, but the TCM function is not configured. Figure 5 A schematic diagram of a possible alarm processing flow provided by Scenario 1 of the embodiment of this application. Figure 5 In the example, the failure of channel 1 between the exit port of node A and the entry port of node B is taken as an example, and channel 2 and channel 3 are both normal channels. When channel 1 fails, the ingress port of node B cannot receive the data frame from node A, that is, it lasts for Y ms from the failure, and if frame fixing failure is detected, it is detected that channel 1 has LOF pre-warning. The ingress port of node C also cannot receive the data frame from node B, therefore, node C will also detect the occurrence of LOF early warning, and node D will also detect the occurrence of LOF early warning.
[0088] When the node B detects that the LOF pre-alarm occurs on channel 1, ...
example 2
[0089] Example 2, Node A and Node B, Node B and Node C, and Node C and Node D belong to the same PM path segment, but belong to different TCM path segments. Figure 6 A schematic diagram of another possible alarm processing flow provided by Scenario 1 of the embodiment of the present application. Figure 6Take channel 1 failure between nodes A and B as an example.
[0090] Node B detects that the LOF pre-alarm occurs on channel 1, and will continuously insert the first maintenance signal frame at the ingress port. However, since the ingress port of Node B and the egress port of Node B belong to different TCM path segments, the egress port of Node B will modify the TCM overhead of the first maintenance signal frame and convert the modified first maintenance signal frame sent to node C. The modified first maintenance signal frame plays the same role as the first maintenance signal frame at each node, and both are used for normal framing, and are processed as normal signal fram...