Unlock instant, AI-driven research and patent intelligence for your innovation.

Steam turbine layout design optimization method in steam power system containing complete steam-water circulation

A technology of steam power system and steam-water circulation, applied in design optimization/simulation, constraint-based CAD, special data processing applications, etc., can solve the problem of not considering water circulation and water cost, water circulation affecting design results, and difficulty in achieving optimal design, etc. problems, to achieve the effect of ensuring effectiveness

Pending Publication Date: 2022-03-25
湖州同润汇海科技有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Another Chinese invention patent with application number CN201310389546.6 (authorized publication number is CN104424372B) discloses a steam power system modeling method and device for power-driven equipment selection, but the steam power system constructed by this method The model is incomplete and does not include important equipment such as deaerators and desuperheaters, nor does it consider the water cycle and water costs in the system
The lack of water circulation will seriously affect the design results, making it difficult to achieve a truly optimal design

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steam turbine layout design optimization method in steam power system containing complete steam-water circulation
  • Steam turbine layout design optimization method in steam power system containing complete steam-water circulation
  • Steam turbine layout design optimization method in steam power system containing complete steam-water circulation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.

[0034] Boilers, deaerators, desuperheaters, condensers, turbo generators, and steam pipe networks are the main equipment in a steam power system with a complete steam-water cycle. The purpose of this embodiment is to find a more economical steam turbine layout scheme from the steam turbine layout design alternatives of the steam power system under the condition that the shaft power requirements of each production process are met.

[0035] Such as figure 1 As shown, the steam turbine layout design optimization method in the steam power system with a complete steam-water cycle in this embodiment includes the following steps:

[0036] Step 1. Determine the performance characteristic parameters of each equipment included in the steam power system with a complete steam-water cycle and the process parameters of the steam power system, wherein the e...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a steam turbine layout design optimization method in a steam power system containing complete steam-water circulation, and the method comprises the steps: determining the performance characteristic parameters of all equipment in the steam power system and the process parameters of the steam power system, and carrying out the flow simulation of the steam power system; generating an alternative scheme of the steam turbine layout according to the production process; then generating a mixed integer linear mathematical model according to the mass balance equation and the energy balance equation of each device, the overall energy balance equation of the steam power system, a steam turbine layout scheme selection equation and a target function equation; a steam turbine layout scheme is selected according to the optimal solution result of the mixed integer linear mathematical model; correcting the performance characteristic parameters of each device and the process parameters of the steam power system at the same time; finally, the steam power system with the determined steam turbine layout structure is subjected to process simulation again, and the overall performance index of the steam power system is verified. The optimization method is more suitable for a real scene.

Description

technical field [0001] The invention relates to the field of steam power, in particular to a steam turbine layout design optimization method in a steam power system with a complete steam-water cycle. Background technique [0002] Steam power system is an important part of large-scale process industries such as petrochemical, metallurgy, pharmaceuticals, and food, and is a major energy consumer within an enterprise. Large-scale process industrial enterprises have a huge demand for steam and electricity, and the construction investment and operation costs of the steam power system are extremely high, and the environmental pollution is also relatively large. With the increasingly tense supply of fossil energy and the increasing efforts of the country to protect the environment, large-scale process industrial enterprises are paying more and more attention to the energy efficiency of steam power systems. Considering the huge volume of the steam power system, improving the steam ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/20G06F119/14G06F111/04
CPCG06F30/20G06F2119/14G06F2111/04
Inventor 顾敦罡楼宇航张楠章婕李光辉饶品华
Owner 湖州同润汇海科技有限公司