Grouting construction method and grouting structure for tunnel to underpass existing line in close range
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The following detailed description is given in conjunction with the accompanying drawings.
[0032] The invention provides a grouting construction method and a grouting structure in which a tunnel penetrates an existing line in a short distance.
[0033] A grouting construction method in which a tunnel penetrates an existing line in a short distance, the method at least comprises:
[0034] S1: In the case of supporting the existing line, remove the original soil layer between the preset tunnel and the existing line.
[0035]The method of supporting the existing line in the present invention is as follows: after the parameter setting of the tunnel to be built is completed, several small-sized working holes are arranged in the area between the tunnel to be built and the existing line, and construction is carried out step by step. In small-scale work holes, especially those close to existing lines, remove soil layers close to existing lines and use jacks, piles and / or bea...