Construction waste operation supervision method and system

A construction waste and supervision system technology, applied in instruments, data processing applications, alarms, etc., can solve problems such as difficulty in accountability, traffic accidents, and construction waste falling, and achieve the effect of reasonable and effective supervision

Pending Publication Date: 2022-05-10
南京精筑智慧科技有限公司
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to factors such as excessive loading of existing muck trucks during transportation, construction waste will fall from the carriage, and when the size of the construction waste falling on the road exceeds a certain range, it will pose a safety threat to other passing vehicles , and even cause traffic accidents
When the driver is driving the muck truck, his attention is mainly on the observation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction waste operation supervision method and system
  • Construction waste operation supervision method and system
  • Construction waste operation supervision method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The present invention will be further illustrated below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented on the premise of the technical solution of the present invention. It should be understood that these embodiments are only used to illustrate the present invention and are not intended to limit the scope of the present invention.

[0024] Such as figure 1 As shown, the embodiment of the present invention provides a construction waste operation supervision method, including:

[0025] The image data of the top of the muck truck compartment in the empty state is collected in advance, and the edge contour information of the compartment is extracted and stored.

[0026] Obtain the speed of the muck truck. When the speed of the muck truck increases from zero to the set speed threshold, collect the image data on the top of the muck truck compartment, and judge whether there is construction waste in the muck truck compart...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction waste operation supervision method and system. The method comprises the steps that image data of the top of a carriage of the muck truck in an empty state are collected in advance, and carriage edge contour information is extracted and stored; when the speed of the muck truck is increased from zero to a set speed threshold value, image data of the top of a carriage of the muck truck are collected, when construction waste exists in the carriage of the muck truck, it is judged that the working state of the muck truck before the muck truck arrives at a construction waste treatment station is a construction waste transportation state, and otherwise, it is judged that the current working state of the muck truck is an empty state; when the muck truck arrives at the construction waste treatment station, the working state of the muck truck is controlled to be set to be a construction waste unloading state, in the construction waste unloading state, collection of the image data of the top of the carriage is stopped, and when the muck truck leaves the construction waste treatment station, the working state of the muck truck is set to be an empty state. According to the invention, alarm reminding and falling event reporting can be carried out when construction waste falls, so that supervision can be carried out more reasonably and effectively.

Description

technical field [0001] The invention relates to the technical field of construction waste operation supervision, in particular to a construction waste operation supervision method and system. Background technique [0002] Construction waste refers to the general designation of muck, waste concrete, waste masonry and other wastes produced by people in the production activities of the construction industry such as demolition, construction, decoration, repair, etc., specifically including muck, crushed stones, waste mortar, Brick and tile fragments, concrete blocks, asphalt blocks, waste plastics, waste metals and waste bamboo and wood, etc. The place where the construction waste is generated is the construction site, and the disposal site of the construction waste is far away from the construction site, so transportation such as muck trucks is required for transfer. Due to factors such as excessive loading of existing muck trucks during transportation, construction waste will...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06V20/52G06V20/59G06V10/44G06V10/75G06K9/62G06Q50/08G06Q50/30G01P3/00G01B11/24G08B21/18
CPCG06Q50/08G06Q50/30G01P3/00G01B11/24G08B21/18
Inventor 付露赵文娟项林杰
Owner 南京精筑智慧科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products