Work item allocation method, device and equipment of project and storage medium
An allocation method and work item technology, applied in the field of project management, can solve problems such as project management difficulties, save time and labor costs, and improve convenience
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Figure 1 Schematic diagram of a work item allocation method for a project provided for embodiment I of the present invention, the present embodiment may be applied to the case of work item allocation in project management, the method may be performed by the work item allocation device of the project, the device may be composed of hardware and / or software, and may generally be integrated in a computer device, the method specifically comprising the following steps:
[0028] S110, get a predetermined queue of idle people.
[0029] Among them, in IT project management, work tasks are generally defined in units of work items, and then work items are assigned to the corresponding project participants. A work item is part of a project that is clearly identifiable or separated for all things that are planned or tracked by the project. There are different types of work items, including tasks, defects, risks, and so on.
[0030]Where the idle person queue can be understood as a ...
Embodiment 2
[0084] Figure 4Structural block diagram of a work item allocation device for a project provided for example two of the present invention, the present embodiment may be suitable for the case of work item allocation in project management, the device may be composed of hardware and / or software, and generally may be integrated in a computer device. as Figure 4 As shown, the apparatus may specifically include: queue acquisition module 21, to be executed to determine module 22 and target work item determination module 23.
[0085] Queue acquisition module 21, for obtaining a predetermined queue of idle personnel, each idle person in the queue is arranged from high to low according to the determined idle priority;
[0086] Pending personnel determination module 22, for selecting idle personnel from the idle personnel queue as the current personnel to be executed;
[0087] Target work item determination module 23, for selecting the target work item to be assigned according to the work...
Embodiment 3
[0111] Figure 5 A block diagram of a computer apparatus provided for embodiment THREE of the present invention, e.g., Figure 5 As shown, the computer apparatus comprises a processor 31, a memory 32, an input device 33 and an output device 34; the number of processors 31 in a computer device may be one or more, Figure 5Taking a processor 31 as an example; the processor 31, memory 32, input device 33 and output device 34 in a computer device may be connected by bus or other means, Figure 5 Take connecting via a bus as an example.
[0112] The memory 32 as a computer-readable storage medium, may be used to store software programs, computer executable programs and modules, such as the module corresponding to the work item allocation method of the project in an embodiment of the present invention (e.g., the project work item allocation device in the queue acquisition module 21, the person to be executed to determine module 22 and the target work item determination module 23). The pro...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



