Intelligent driving scheduling method and system for rail transit construction line

A rail transit and scheduling method technology, applied in data processing applications, instruments, calculations, etc., can solve problems such as the inability to resolve traffic conflicts, and the difficulty of directly applying the traffic scheduling scheme to construction lines, so as to meet the needs of real-time scheduling, The effect of improving practical application value and improving decision-making response speed

Pending Publication Date: 2022-05-31
NORTHEASTERN UNIV
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The above-mentioned patent is about the traffic scheduling scheme of the railway operation line that has been completed and in service. There are big differences in line conditions, operating vehicles, technical equipment and service objects from the construction line, and the traffic scheduling scheme designed for the operation line is difficult to directly Applied to the construction line
At present, there is no relevant patent on traffic scheduling of high-speed rail track construction lines
However, the existing construction line management information system can only realize the detection and alarm of traffic conflicts, and cannot resolve traffic conflicts to automatically generate traffic scheduling plans.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent driving scheduling method and system for rail transit construction line
  • Intelligent driving scheduling method and system for rail transit construction line
  • Intelligent driving scheduling method and system for rail transit construction line

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0063] The invention will be further described below with reference to the accompanying drawings and specific implementation examples. The development architecture diagram of the intelligent traffic dispatching system for rail transit construction lines is shown in the figure below. figure 2 shown. The itinerary data received in this embodiment is transmitted from the existing "track construction informatization" system, including the standard itinerary data obtained by each construction department at the construction site by reporting the construction day plan, and then being reviewed by the superior department , including locomotive number, construction task type, work content, construction start point, construction end point, departure position, closing position, expected start time, expected end time, and train group information. The received itinerary data is saved in a csv-type task demand description file in the form of a table. The format and definition of each field...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an intelligent driving scheduling method and system for a rail transit construction line, and the method comprises the steps: firstly collecting the travel arrangement data of all construction driving tasks on the rail transit construction line, and constructing a to-be-scheduled construction driving task set; performing priority ranking on the construction driving tasks according to the construction type and the construction starting point; and finally, constructing an optimization objective function of construction driving scheduling, and carrying out iterative optimization to generate a rail transit construction line driving scheduling scheme. A construction task priority division method is introduced, the problem search scale can be effectively reduced, the decision response speed of the method and system can be improved, meanwhile, the generated scheduling scheme can better meet the requirement of actual construction driving, and an iterative optimization method is further provided; in each optimization process, only part of construction tasks are scheduled, rapid solving of problems is achieved, and therefore the real-time scheduling requirement of construction line travelling crane operation is met, and the practical application value of the method is improved.

Description

technical field [0001] The invention belongs to the technical field of traffic scheduling, and in particular relates to an intelligent traffic scheduling method and system for a rail transit construction line. Background technique [0002] With the continuous development of high-speed railways, tasks such as the construction of new lines and the renovation of existing lines have become more arduous, and the arrangement of equipment, vehicles and personnel has become more compact, especially for construction tasks that need to be completed with the help of special vehicles and equipment for track construction on the construction line (referred to as construction cranes). How to formulate a reasonable and efficient construction driving task plan under the constraints of ensuring equipment and life safety production is an important means to improve equipment utilization, shorten construction period and economic efficiency. Traffic scheduling of high-speed railway construction l...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
CPCG06Q10/06316G06Q10/06313Y02T10/40
Inventor 崔东亮代学武郑秀萍柴天佑岳鹏程丽娟
Owner NORTHEASTERN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products