Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction technology for protecting tool type elevator shaft installed on front vertical face without disassembly and change

A construction technology, elevator shaft technology, applied in the processing of building materials, construction, building construction, etc.

Pending Publication Date: 2022-07-22
JIANGSU NANTONG SANJIAN CONSTRUCTION GROUP CO LTD
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, its rotating mechanism includes a beam, a rotating shaft welded to the bottom end of the beam, and a supporting plate welded to the bottom end of the rotating shaft. The supporting plate is clamped with the angle steel limit plate under the sleeve, and cannot be moved horizontally outward or vertically upward. compound exercise

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction technology for protecting tool type elevator shaft installed on front vertical face without disassembly and change
  • Construction technology for protecting tool type elevator shaft installed on front vertical face without disassembly and change
  • Construction technology for protecting tool type elevator shaft installed on front vertical face without disassembly and change

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The construction process of the tool-type elevator shaft protection installed on the front facade that does not need to be dismantled and modified, including the following steps:

[0031] Step (1): as figure 1 , 2 As shown, the elevator shaft 1 and its adjacent reinforced concrete beams and slabs 2 on the same floor are organized according to the conventional method, such as steel bar binding, formwork support concrete maintenance, formwork removal and other processes to form the elevator shaft door opening 3. A protective frame 4 is set up in the elevator shaft 1, and a hard isolation layer 5 is laid according to the regulations.

[0032] Step (2): as image 3 , 4 As shown, using the conditions of the elevator shaft protection frame 4, use an electric hammer to drill a hole with a depth of ≥ 100 mm on the inner side of the elevator shaft door opening 3, and about 200 mm away from the side of the elevator shaft door opening 3; The steel plate hole 101 is aligned wit...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a front facade installation tool type elevator shaft protection construction process without disassembly and change, which comprises the following steps: after a protection frame and a hard isolation layer are erected in a shaft, firstly drilling holes in the inner side of the wall of the shaft, then installing a steel plate with holes, and finally welding a round pipe. And a round pipe is welded on a crosspiece on the protective fence door and is conveyed to a mounting position. The short end of the connecting piece is inserted into the round pipe of the rear steel plate, the long end with the thread is inserted into the round pipe of the upper crosspiece of the protective fence door, and the nut is screwed down. When an elevator front room is decorated, the lower crosspiece of the protective fence door is heightened, so that the distance between the protective fence door and the outer side face of the shaft wall has the requirement for decoration operation. Before construction of the elevator front room terrace, the cushion block below the lower crosspiece of the protective fence door is pulled out, so that the distance required by terrace construction is reserved between the lower crosspiece of the protective fence door and the terrace surface, and the lower crosspiece of the protective fence door is tightly attached to the decoration finished surface; and the lower crosspiece of the protective fence door is lifted backwards and upwards, so that a gap convenient for garbage cleaning is formed between the lower opening of the lower crosspiece and the elevator shaft wall.

Description

technical field [0001] The invention relates to a construction process for a tool-type elevator shaft protection installed on the front facade that does not need to be dismantled and modified, in particular to a construction process of the tool-type elevator shaft protection installed on the front facade without the need for removal and modification, and in particular to a tool type elevator shaft protection installed on the outer side of the elevator shaft During the decoration and the construction of the elevator front room floor, the construction process can be completed as long as the elevator shaft protective fence door is slightly changed, such as padding. Background technique [0002] With the development of building construction technology and the variety of human needs, various reinforced concrete buildings with elevators have sprung up like mushrooms after a rain. [0003] In the stage of organizing the implementation of reinforced concrete buildings, the protectio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04G21/32
CPCE04G21/3204E04G21/3219
Inventor 黄建逵唐海中秦锦帅赵振华常蒙蒙
Owner JIANGSU NANTONG SANJIAN CONSTRUCTION GROUP CO LTD