[0008] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0009] In the translation project of the comprehensive service building of Wuzhou Personnel Bureau in Guangxi, the present invention is used to underpin the load of buildings. First, drill the column with a hole diameter of 28mm, then clean the residue in the hole, inject chemical glue, implant a 25mm diameter threaded steel bar, bind the steel bar after the glue strength increases, and finally pour concrete and connect it with the upper track beam , completing the underpinning of the load. The underpinning was very successful. Although it was a 20-storey building, there was no crack until the final stage of construction, which shows that its safety is very high.