The application discloses a kind of
tower equipment pre-buried
anchor bolt integral hoisting construction methods, first, the positioning axis consistent with the axis of positioning mould is ejected along the center of equipment foundation;After installing vertical support, positioning mould is hoisted as a whole, and each
anchor bolt is sequentially assembled into the mounting hole of positioning mould, so that positioning mould and
anchor bolt are connected into a whole in the air;The positioning mould and anchor bolt that have been assembled are hoisted into the equipment foundation insert bar, after anchor bolt anchor plate falls below horizontal support elevation, horizontal support construction is carried out, then positioning mould and anchor bolt are dropped to positioning mould support frame, anchor bolt is calibrated and reinforced, then steel binding, formwork installation and concrete pouring are carried out, equipment foundation construction is completed, and formwork is removed and positioning mould is removed.The application adopts positioning mould and anchor bolt integral
assembly in the air, reduces the precision error generated by secondary
assembly on site, and improves the pre-buried anchor bolt integral hoisting efficiency.