Concrete filling pile head static cutting and crushing method

A technology of static cutting and crushing method, which is applied in the direction of sheet pile walls, stone processing tools, manufacturing tools, etc., can solve the problems of not being suitable for cast-in-situ piles, and the inability to cut concrete into small blocks, so as to reduce construction costs and labor intensity, The effect of shortening the construction period and easy construction operation

Active Publication Date: 2011-05-18
BEIJING ZHONGYANYI ENG TECH DEV CENT
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the actual implementation, the inventor found that the location, method and quantity of the cutting body have a great influence on the cutting effect, and the method of installing in the vertical reinforcement of the steel cage disclosed in the previous patent is only applicable to the diameter of the cast-in-place pile larger than 1000mm In the case of less than 1500mm, it is not suitable for all sizes of cast-in-place piles. In the process of cutting and lifting and pulling out cast-in-place piles of other sizes, there is a defect that the concrete cannot be cut into small pieces.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Concrete filling pile head static cutting and crushing method
  • Concrete filling pile head static cutting and crushing method
  • Concrete filling pile head static cutting and crushing method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0032] Example 1: Horizontal cutting of pile heads of cast-in-situ piles with a diameter less than 1000mm

[0033] All the same as the other steps of the comparative example, the difference is that three cutting bodies 3 are used in the step 2), and the cutting bodies are all arranged outside the vertical reinforcement 1 (see figure 2 ). In this case, the cutting force of the cutting body is sufficient to cross the resistance of the steel bar, and the concrete of the cast-in-place pile is cut off along the predetermined position, and the cutting body is arranged outside the vertical steel bar 1, which can prevent the small-diameter pile from falling down during the concrete pouring process. The feed tube touches the cutting body.

Embodiment 2

[0034] Example 2: Horizontal cutting of pile heads of cast-in-situ piles with a diameter greater than 1600mm

[0035] The other steps are the same as those of the comparative example, except that six or more cutting bodies 3 are used in step 2), and the cutting bodies are arranged in the vertical reinforcement 1, and at least one A supporting steel bar 7, the supporting steel bar 7 is in the same horizontal plane as other cutting bodies 3, and another cutting body 3' is also bound to the supporting steel bar 7. Such as image 3 Shown, have shown to have set up two supporting steel bars 7 and cutting body 3 ' in addition. Like this, the cutting body 3 ' on the supporting steel bar 7 can produce horizontal cracks when the concrete in the middle of the reinforcement cage hardens, thereby also producing cutting action to this part concrete, so that the hoisting of step 4) is easier. If no support reinforcement is provided for auxiliary cutting, the large-diameter pile cannot be ...

Embodiment 3

[0036] Example 3: Two-way cutting of cast-in-situ pile head

[0037] 1) Wrap or put isolation material 6 on each vertical steel bar 1 reserved for the reinforcement cage of cast-in-situ pile (belt-shaped isolation material for wrapping, tubular isolation material for wrapping, foam plastic, rubber-plastic material for isolation material) , paper products, etc.) to prevent concrete from bonding to vertical reinforcement.

[0038] 2) Fix multiple cutting bodies 3 with metal, plastic, cotton, linen or other materials horizontally and evenly distributed in a circle on the vertical reinforcement of the reinforcement cage at the design position where the concrete needs to be removed from the cast-in-situ pile inside), generally each vertical steel bar is a binding point; at the same time, a cutting body 3' is vertically fixed with a binding line outside the isolation material 6 of each vertical steel bar 1, see Figure 4 .

[0039] 3) After hoisting the reinforcement cage with the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
diameteraaaaaaaaaa
lengthaaaaaaaaaa
diameteraaaaaaaaaa
Login to View More

Abstract

The invention discloses a pile head static cutting crushing method for a bored concrete pile; a plurality of cutting bodies are evenly and horizontally fixed around the vertical steel ribs of a steel reinforcement cage of the bored pile on the position where the concrete needs to be removed; the concrete is poured after the steel reinforcement cage is hung into the pile hole; the pile head concrete is pulled out by a hoisting device or is cleaned manually after the concrete hardens; the pile head static cutting crushing method is characterized in that the number and the distribution form of the cutting bodies are designed according the diameter of the bored pile; for the bored pile with the diameter less than 1000mm, the cutting bodies are distributed outside the vertical steel ribs; for the bored pile with the diameter more than 1600mm, the cutting bodies are distributed inside the vertical steel ribs and at least a support steel rib is arranged in the pile parallel to the cutting bodies; each support steel rib is fixed bound with a cutting body; besides, one cutting body can be vertically fixed outside each vertical steel rib to realize the bidirectional cutting. The pile head static cutting crushing method for the bored concrete pile has the advantages of obviously reducing the construction cost and the labor intensity, shortening the construction period, preventing the vibration noise and the dust in the construction process, being applicable to the popularization and application of the construction industry.

Description

technical field [0001] The invention relates to a static cutting and crushing method for pile heads of concrete pouring piles, which belongs to the matching treatment measures after concrete building components are poured and formed. Background technique [0002] Concrete pouring pile is a structural measure often used in industrial and civil construction and foundation construction to improve the bearing capacity of the foundation. It is widely used in high-rise buildings, bridges and some areas with poor ground endurance. Since the concrete on the top layer will be mixed with the mud in the pile hole during the pouring and forming process of the cast-in-place pile, the strength is very low and cannot reach the design strength of the pile body. Therefore, this part of the pile head concrete must be cut off to expose the pile body. vertical steel bars. But for a long time, there has been no good way to deal with the excess concrete at the pile head. It can only be removed m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/34E02D13/08B28D1/22
Inventor 赵顺增刘立姚燕游宝坤曹淑萍武旭南吴勇杨伊静
Owner BEIJING ZHONGYANYI ENG TECH DEV CENT