Construction method of socket water stop curtain for dual spindle soil-cement stirring mill
A technology for a cement-soil mixer and a cement-soil mixing pile, which is applied in the directions of infrastructure engineering, construction, sheet pile walls, etc., can solve problems such as split ends, and achieve the effects of ensuring safety, saving construction sites, and improving integrity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] The basement pit of a project on Daguang Road, Nanjing City, Jiangsu Province is 7m deep, and the four sides of the pit are 170m long. The ground to 4m below the ground is plain fill, the below 4m is silt, and the groundwater level is 1.1m below the ground. In order to prevent the groundwater outside the foundation pit from flowing into the foundation pit and ensure the safety of the foundation pit construction and the buildings around the foundation pit, it is necessary to set up a water-stop curtain around the foundation pit. Since the foundation pit is located in the center of the city, the construction site is limited. At the same time, in order to save the project cost, a single row of water-stop curtain is designed on the periphery of the foundation pit. The design pile bottom depth of cement-soil mixing pile 1 is 13m, and the design pile top depth is the ground. Then, a construction method in which a two-axis cement-soil mixer is socketed with a water-stop curtai...
Embodiment 2
[0037] The basement pit of a project on Hankou Road, Nanjing City, Jiangsu Province is 9m deep, and the four sides of the pit are 200m long. The ground to 3m below the ground is silty clay, 3m to 7m below the ground is silt, 7m below the ground is sandy, and 1m below the ground is groundwater. In order to prevent the groundwater outside the foundation pit from flowing into the foundation pit and ensure the safety of the foundation pit construction and the buildings around the foundation pit, it is necessary to set up a water-stop curtain around the foundation pit. Since the foundation pit is located in the center of the city, the construction site is limited. At the same time, in order to save the project cost, a single row of water-stop curtain is designed on the periphery of the foundation pit. The depth of the pile bottom of the cement-soil mixing pile 1 is 17m, and the design depth of the pile top is the ground. Then, a construction method of a double-axis cement-soil mixe...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com