Method and apparatus setting activation period starting point to user equipment
一种用户设备、激活期的技术,应用在连接管理、高级技术、气候可持续性等方向,能够解决分布不均匀、无线资源利用不平衡等问题,达到避免不平衡、消除不利影响、好服务的效果
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0039] image 3 A block diagram of an apparatus for setting the starting point of an activation period by a user autonomously according to the first embodiment of the present invention is shown. Such as image 3 As shown, according to the device for setting the starting point of the activation period independently by the user according to this preferred embodiment, the network side (eNB: source node or base station) is configured with a discontinuous reception (DRX) parameter calculation unit 31, a DRX status register 32, and The transmitting / receiving unit 33 is configured with a transmitting / receiving unit 34 , a DRX parameter calculation unit 35 , and a DRX state adjustment unit 36 at the UE side.
[0040] On the eNB side, the transmitting / receiving unit 33 (which may serve as the first transmitting / receiving unit) is used to send and receive information from the wireless interface. The DRX parameter calculation unit 31 (which may serve as a first DRX parameter calculat...
no. 2 example
[0050] Figure 6 It shows a block diagram of an apparatus for setting an activation period starting point for a UE by an eNB according to the second embodiment of the present invention. Such as Figure 6 As shown, according to the device for setting the starting point of the activation period independently by the user according to this preferred embodiment, a discontinuous reception (DRX) parameter calculation unit 61 and a DRX configuration encapsulation unit 62 are configured on the network side (eNB: source node or base station), The DRX state register 63, the transmitting / receiving unit 64, and the transmitting / receiving unit 65 and the DRX state adjusting unit 66 are configured on the UE side.
[0051] On the eNB side, the DRX parameter calculation unit 61 can use the above formula (1) to calculate the start point of the activation period of the UE discontinuous reception state, and save the calculation result in the DRX status register 63, or use the calculation result ...
no. 3 example
[0071] Figure 11 It shows a block diagram of an apparatus for independently setting the starting point of the activation period by the UE and notifying the eNB according to the third embodiment of the present invention. Such as Figure 11 As shown, according to this preferred embodiment, the device for setting the starting point of the activation period autonomously by the user is configured with a DRX status register 111 and a transmitting / receiving unit 112 on the network side (eNB: base station), and a transmitting / receiving unit 112 is configured on the UE side. / Receiving unit 113 , DRX parameter calculation unit 114 , DRX state adjustment unit 115 , and DRX configuration encapsulation unit 116 .
[0072] Compared with the first and second embodiments above, a DRX status register 111 and a transmitting / receiving unit 112 are configured on the eNB side. The eNB saves the DRX configuration information received by the transmitting / receiving unit 112 including the start po...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com