Hopper slag collecting pit
A slag collection pit and funnel-type technology, applied in mining equipment, earthwork drilling, tunnels, etc., can solve problems such as difficult cleaning and traffic obstruction, achieve high slag collection rate and reduce project investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] Such as figure 1 , 2 , image 3 As shown, the slag collection pit 2 is centrally arranged at the end of each diversion tunnel 1 of the power station, and its length is determined through tests or similar engineering experience to ensure that the slag falling along the tunnel can smoothly enter the pit under the maximum flow rate. The width of the slag collection pit 2 is the same as the width of the bottom plate of the water diversion tunnel 1, and a ramp with a slope rate of 10% is set at the upstream of the slag collection pit 2 to connect smoothly with the bottom of the water diversion tunnel 1, and the depth of the downstream of the slag collection pit 2 meets the general structural requirements. Take it as 1.5m. A grid beam 8 is arranged on the top of the downstream part of the slag collection pit 2, which ensures a high slag collection rate of the slag collection pit 2 and prevents the slag falling into the slag collection pit 2 from starting again and crossing ...
Embodiment 2
[0022] Such as figure 1 , 2 , image 3 As shown, the slag collection pit 2 is centrally arranged at the end of each diversion tunnel 1 of the power station, and its length is determined through tests or similar engineering experience to ensure that the slag falling along the tunnel can smoothly enter the pit at the maximum flow rate. The width of the slag collection pit 2 is the same as the width of the bottom plate of the water diversion tunnel 1. A ramp with a slope rate of 11% is set at the upstream of the slag collection pit 2 to connect smoothly with the bottom of the water diversion tunnel 1. The depth of the downstream of the slag collection pit 2 meets the general structural requirements. Take it as 2m. A grid beam 8 is arranged on the top of the downstream part of the slag collection pit 2, which ensures a high slag collection rate of the slag collection pit 2 and prevents the slag falling into the slag collection pit 2 from starting again and crossing the slag coll...
Embodiment 3
[0026] Such as figure 1 , 2 , image 3 As shown, the slag collection pit 2 is centrally arranged at the end of each diversion tunnel 1 of the power station, and its length is determined through tests or similar engineering experience to ensure that the slag falling along the tunnel can smoothly enter the pit under the maximum flow rate. The width of the slag collection pit 2 is the same as that of the bottom plate of the water diversion tunnel 1, and a ramp with a slope rate of 12% is set at the upstream of the slag collection pit 2 to connect smoothly with the bottom of the water diversion tunnel 1, and the depth of the downstream of the slag collection pit 2 meets the general structural requirements. Take it as 2.5m. A grid beam 8 is arranged on the top of the downstream part of the slag collection pit 2, which ensures a high slag collection rate of the slag collection pit 2 and prevents the slag falling into the slag collection pit 2 from starting again and crossing the s...