Method for evaluating hazard of gas tunnel and device for implementing same
An evaluation method and risk technology, applied in the field of gas tunnel risk evaluation method and its implementation equipment, can solve the problems that the index system has not been established and has not been fully developed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Such as figure 1 As shown, the gas tunnel hazard index data is evaluated at the construction site. The stratum lithology (surrounding rock permeability) measured in the gas tunnel work area is shale; the measured geological structure is a closed coal seam structure; 1.0; the measured gas pressure is 0.35; after investigation, the construction team has certain experience; the technical level of the construction team is medium; the engineering measures adopted by the construction team are general ventilation; Hazard index data (4) is sequentially input to the data processor (3) and the hazard index evaluation blank table read from the form memory (2) image 3 In the process, when the data (4) is input, compare and classify the input data with the indicators in the gas tunnel hazard index classification table memory (1), and assign values, and at the same time, assign the results of the classification and assignment to generate index evaluations. class statistics Figur...
Embodiment 3
[0035] Such as figure 1 As shown, the gas tunnel hazard index data is evaluated at the construction site. The formation lithology (surrounding rock permeability) measured in the gas tunnel work area is silt; the measured geological structure has nothing to do with the coal seam; the measured number of times of coal removal is 2 times; the measured absolute gas emission is 0.4; the measured gas concentration is 0.2; The measured gas pressure is 0.1; after investigation, the construction team has experience; the construction team has a high technical level; the engineering measure adopted by the construction team is to strengthen ventilation; the management system of the construction team is relatively loose. The above-measured salient risk index data (4) are sequentially input into the risk index evaluation blank table that the data processor (3) reads from the form memory (2) image 3 In the process, when the data (4) is input, compare and classify the input data with the ind...
Embodiment 4
[0037] Such as figure 1 As shown, the gas tunnel hazard index data is evaluated at the construction site. The stratum lithology (surrounding rock permeability) measured in the gas tunnel work area is mudstone; the measured geological structure is a closed coal seam structure; the measured number of coal uncovering is 10 times; the measured absolute gas emission is 2.5; the measured gas concentration is 1.5 The measured gas pressure is 0.7; after investigation, the construction team has only certain experience; the construction team has a medium technical level; the construction team has not taken engineering measures; The above-measured salient risk index data (4) are sequentially input into the risk index evaluation blank table that the data processor (3) reads from the form memory (2) image 3 In the process, when the data (4) is input, compare and classify the input data with the indicators in the gas tunnel hazard index classification table memory (1), and assign values, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com