Re-devulcanization method based on circulating fluidized bed boiler flue
A technology of circulating fluidized bed and boiler flue, which is applied in the field of boiler desulfurization to achieve uniform atomization, prevent scaling, broad application prospects and promotion space
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Design a 75t / h circulating fluidized bed boiler in a power plant to implement the re-desulfurization method based on the circulating fluidized bed boiler flue of the present invention. The process equipment flow chart is as follows figure 1 Shown.
[0024] The specific design basis is as follows:
[0025] Sulfur content of burning coal≤1.5%
[0026] Coal consumption of boiler during normal production ≤11t / h
[0027] Boiler flue gas volume 125000m 3 / h
[0028] SO before desulfurization 2 Emission concentration 2112mg / Nm 3
[0029] The method of re-desulfurization based on the flue of circulating fluidized bed boiler is to install humidification on the vertical flue at the end of the boiler which is lined with anti-corrosion plate 11 between the existing circulating fluidized bed boiler furnace 3 and the electrostatic precipitator 7. Device 6, wherein: the humidification device is composed of a humidifier 10, an air guiding device 12 and a slag remover 13; the humidifier 10 is com...
Embodiment 2
[0040] Design a 130t / h circulating fluidized bed boiler in a power plant to implement the re-desulfurization method based on the circulating fluidized bed boiler flue of the present invention. The process equipment flow chart is as follows figure 1 Shown.
[0041] The specific design basis is as follows:
[0042] Sulfur content of burning coal≤1.5%
[0043] Coal consumption of boiler during normal production ≤20t / h
[0044] The boiler flue gas volume is 170,000m 3 / h
[0045] SO before desulfurization 2 Emission concentration 2824mg / Nm 3
[0046] The method of re-desulfurization based on the flue of a circulating fluidized bed boiler is to install an alkali increase in the vertical flue at the end of the boiler equipped with an anticorrosive plate 11 between the existing circulating fluidized bed boiler furnace 3 and the electrostatic precipitator 7 Device 6, wherein: the alkali increasing device is composed of a humidifier 10, an air guiding device 12 and a slag remover 13; the humidif...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 