10KV station electric control system of convertor station adopting selecting 2 from 3 logic
By adding two PS830 boards for parallel processing in the 10KV station power control system, and implementing a 3-out-2 logic design in the ASI host and PS853 board, the problem of station-wide power outage caused by the failure of a single PS830 board was solved, and the system efficiency was improved. Redundancy and reliability ensure the safe and stable operation of the 10KV control system.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- STATE GRID CORPORATION OF CHINA
- Filing Date
- 2008-10-08
- Publication Date
- 2010-05-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing 10KV station power control system relies on a single PS830 board for switch operation interlocking and backup and automatic switching logic. As a result, once the board fails, it may cause a station-wide power outage and lacks redundancy and reliability.
Adding two PS830 boards for parallel processing, combined with the 3-out-2 logic design in the ASI host and PS853 board, ensures that at least two boards issue the same command to perform the switch operation, avoiding false jumps or rejections caused by a single board failure.
The safe and stable operation of the 10KV control system is ensured. Even if any PS830 board is damaged, the normal operation of the switch will not be affected, which improves the redundancy and reliability of the system and avoids the risk of a station-wide power outage.