Horizontal annular steel bar connecting component for precast concrete components and construction method

A prefabricated concrete and horizontal ring technology, which is applied in building structures, buildings, etc., can solve the problems that affect the wide application of prefabricated concrete structures, the connection performance is not easy to guarantee, the connection procedure is complicated, etc. The effect of strong relationships

A prefabricated concrete and horizontal ring technology, which is applied in building structures, buildings, etc., can solve the problems that affect the wide application of prefabricated concrete structures, the connection performance is not easy to guarantee, the connection procedure is complicated, etc. The effect of strong relationships

CN101881049BActive Publication Date: 2013-01-16HUBEI YUHUI NEW BUILDING MATERIAL

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Horizontal annular steel bar connecting component for precast concrete components and construction method
  • Horizontal annular steel bar connecting component for precast concrete components and construction method
  • Horizontal annular steel bar connecting component for precast concrete components and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0022] The prefabricated concrete component horizontal ring bar connection component comprises: a prefabricated concrete component body 1, the component body 1 is pre-embedded with one-to-one corresponding steel bars for horizontal connection with each other in the horizontal direction, and the steel bars are exposed The part is semi-circular, and the one-to-one corresponding steel bars have upper rib 2 and lower rib 3, the exposed part of the upper rib is bent downward by 90 degrees, and the exposed part of the lower rib is bent upward 90 degrees, the pre-embedded end 4 of the steel bar is fully anchored in the prefabricated concrete member, and the ring-shaped steel bar 5 is placed above the one-to-one corresponding steel bar, and inserted between the corresponding steel bar and the ring-shaped steel bar Longitudinal steel bar 6.

[0023] Said prefabricated concrete component horizontal ring bar connecting member, the semi-ring part of the corresponding steel bar is lapped w...

Embodiment 2

[0027] The construction method of horizontal ring reinforcement connection of precast concrete components, the connection method of horizontal ring reinforcement of precast concrete components, the prefabricated concrete components are pre-embedded one-to-one corresponding semi-ring steel bars with 90-degree bending of the upper and lower ribs, and their prefabricated The buried end is fully anchored in the prefabricated concrete component to fully anchor the exposed semi-circular steel precast concrete component body, and the corresponding pre-embedded bent semi-circular steel bar is placed on the upper part after being straightened on site. The semi-circular steel bars are handed over to each other, and a certain handover gap is reserved between them. Longitudinal steel bars are inserted into the handover space. After that, the formwork is supported on the front and rear sides of the joint, and concrete is poured from the upper part. After curing, the two prefabricated concret...

Embodiment 3

[0029] According to the construction method of horizontal ring reinforcement connection of precast concrete members described in embodiment 1 or 2, there is a pre-embedded semi-ring corresponding to each other, bent at 90 degrees up and down, and its pre-embedded end is fully anchored and exposed in the precast concrete member. The body of the prefabricated concrete member with shaped steel bars, the corresponding pre-embedded bent semi-annular steel bars are placed on the upper part after being straightened on site, and welded ring-shaped steel bars are placed on the upper part, and the embedded semi-annular steel bars on both sides are handed over to each other. There is a certain handover gap. Longitudinal steel bars are inserted into the handover gap. After that, the formwork is supported on the front and rear sides of the joint, and concrete is poured from the top. After curing, the two precast concrete components are connected into a whole. In order to enhance the connect...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a horizontal annular steel bar connecting component for precast concrete components and a construction method. The key of horizontal connection between the precast concrete components is the connection of steel bars; and the precast concrete components are welded by the steel bars or are connected mechanically in conventional methods. A product comprises precast concrete component bodies (1), wherein the steel bars which can perform the horizontal connection in the horizontal direction and correspond to each other one by one are pre-buried in the precast concrete component bodies (1); the exposed part of the steel bars are semicircular; the steel bars correspond to each other one by one comprise upper steel bars (2) and lower steel bars (3); the exposed part of theupper steel bars are bent at an angle of 90 degrees downwards; the exposed part of the lower steel bars are bent at an angle of 90 degrees; the pr-buried ends (4) of the steel bars are fully anchoredin the precast concrete components; annular steel bars (5) are arranged above the steel bars which correspond to each other one by one; and longitudinal through and long steal bars (6) are inserted between the corresponding steel bars and the annular steel bars. The horizontal annular steel bar connecting component and the construction method are used for the horizontal connection between the precast concrete structural components.

Description

Technical field: [0001] The invention relates to a connection method of prefabricated concrete components and belongs to the field of construction, in particular to a horizontal ring bar connection component of prefabricated concrete components suitable for housing industrialization and a construction method. Background technique: [0002] The key to the horizontal connection between precast concrete components is the connection of steel bars. The traditional method is through steel welding or mechanical connection, but the connection procedure is complicated, the cost is high, and the connection performance is not easy to guarantee. This will seriously affect the widespread application of precast concrete structures. Invention content: [0003] The invention provides a horizontal connection method between prefabricated concrete components, which eliminates the need for complicated procedures and mechanical equipment when horizontally connecting the prefabricated concrete ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
16 Jan 2013
Publication
CN101881049B
IPC
E04B1/38; E04B1/41
Inventors
刘文清; 闫红缨