Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

118results about How to "Suitable for construction" patented technology

Method for smelting low-sulfur copper concentrate

The invention discloses a method for smelting low-sulfur copper concentrate, relating to copper concentrate, in particular to a method for producing rough copper or rough copper alloy from low-sulfur copper sulfide concentrate or copper sulfide concentrate comprising a part of copper oxide. The method is characterized by comprising the following smelting processes of: mixing sulfur or pyrite into the copper concentrate; performing boiling oxidizing roasting to produce calcine; performing reduction smelting on the calcine through an ore-smelting electric furnace to obtain rough copper or rough copper alloy; treating flue gas produced during the boiling oxidizing roasting and smelting of the ore-smelting electric furnace through a waste heat boiler, electrical dust collection and cloth bag dust collection; and feeding the treated flue gas into an acid making system to produce sulfuric acid. By adopting the method, the copper sulfide concentrate with low sulfur content and high silicon content or the copper sulfide concentrate comprising a part of the copper oxide, which cannot be subjected to self-heating matte smelting, can be treated; and the method has the advantages of a short process flow, less investment and a short construction period and is suitable for building small-scale copper smelting enterprises at electric power-rich areas.
Owner:BEIJING GENERAL RES INST OF MINING & METALLURGY

Inner wall board joint treatment technology

InactiveCN101230593ASolve common problems in the applicationPrevent board seam through seamWallsBuilding insulationsFireproofingEngineering
A wallboard seam processing technic belongs to the technical field of inner wallboard processing of building. The processing method is realized by that: a flute arranged at one side of a wallboard is internally affixed with rubber sponge with a certain thickness, the two sides of the rubber sponge are smeared with polymer sand pulp, and then the rubber sponge is abutting-jointed with a tenon of the wallboard or the side or the pillar of the wallboard as well as is tightly squeezed by force, so as to lead the rubber sponge to have a certain decrement; after that, the two sides of the seam are filled with elastic sealing compounds with a certain thickness, finally, the two sides of the seam are affixed with an anticracking gridding adhesive tape. The material in the seam of wall in the wallboard seam processing technic adopts elastic material, so as to solve the problem that generally appears and is hard to be settled of straight joint of slab joint caused by structural distortion or walling material drying shrinkage; furthermore, the rubber sponge adopted in the middle of the slab joint is made of fire resistant heat insulating material and can prevent a heat channel from generating among the slab joints, thereby having certain fireproofing performance. The invention is applicable to the slab joint processing of most of the inner wallboards such as a GRC board, a plasterboard, a hollow slat, etc. at the present time.
Owner:SHANDONG LAIGANG CONSTR CO LTD

Rapid construction method for transverse partitioning and longitudinal sectioning of urban elevated steel box girder bridge

The invention discloses a rapid construction method for transverse partitioning and longitudinal sectioning of an urban elevated steel box girder bridge. The rapid construction method particularly comprises the following steps: firstly, determining longitudinal sectioning and transverse partitioning cutting parts, and then, determining longitudinal cutting parts of a steel box girder; transversely partitioning the box girder according to the number of box chambers of the steel box girder, wherein each box chamber serves as a partition; splicing a hoisting unit on a jig, assembling a bottom plate, a transverse diaphragm, a web and a top plate in sequence, and welding the structures; and finally, carrying out hoisting and welding on the site. The hoisting process is carried out from top to bottom in height, from two sides to middle span in longitudinal bridge direction, and from middle to two sides in transverse bridge direction. The rapid construction method disclosed by the invention is capable of reducing the on-site construction time to the maximum limit and reducing the influence on the urban environment; and by virtue of longitudinal sectioning and transverse partitioning, the requirement for the hoisting capacity of hoisting equipment can be reduced, the difficulty of transporting large-section box girders in a city is reduced, and thus the rapid construction method is more suitable for construction of the urban elevated steel box girder bridge.
Owner:ZHEJIANG UNIV

Enclosing type deepwater platform construction method based on condition of sand backfilling balance method

ActiveCN105220703AReduce soil pressure differenceReduce the bending momentFoundation engineeringSupporting systemSurface layer
The invention discloses an enclosing type deepwater platform construction method base on the condition of a sand backfilling balance method. The enclosing type deepwater platform construction method is characterized in that firstly, cofferdams of construction steel sheet piles are formed on the river bed surface, back covering concrete layers are formed in the cofferdams through underwater pouring, and sandy soil of which the height is greater than that of the back covering concrete layers of the outer sides of the cofferdams is sucked to the interior of the steel sheet cofferdams through dredging tubes so that height difference of sandy soil of the inner side of the steel sheet cofferdams and the outer side of the steel sheet cofferdams is reduced; water is extracted gradually in the steel sheet cofferdams and inner supports are installed sequentially, and temporarily stored sandy soil is hoisted out of the cofferdams so that surface layers of the back covering concrete layers are exposed; platform templates are arranged on the back covering concrete layers, and a platform template supporting system is formed by installing I-shaped steel between the steel sheet piles and the platform templates; and first layer platform concrete, concrete top beams and second layer platform concrete are poured in the platform templates in sequence, and sandy soil is backfilled between the steel sheet piles and the platform templates at the same time and the construction of platform concrete is completed. According to the enclosing type deepwater platform construction method, cofferdam platform is easy to construct on abrupt slope or deepwater sandy riverbed.
Owner:ANHUI HIGHWAY BRIDGE ENG CO LTD

Method for improving wear-resistant anti-corrosion property of coating of heating surface of boiler

The invention relates to a method for improving wear-resistant anti-corrosion property of a coating of a heating surface of a boiler. A shot blasting technology is adopted for carrying out shot blasting treatment on a metal coating or a metal ceramic coating for obtaining a compact coating, porosity is reduced, permeability of corrosive atmosphere is reduced, and bonding strength, corrosion resistance and wear resistance of the coating are improved. The method for improving the wear-resistant anti-corrosion property of the coating of the heating surface of the boiler comprises the following steps: ash removal is carried out on the heating surface of the boiler sprayed with the coating by adopting compressed gas, and the surface of the coating is maintained to be clean; steel shots are adopted for carrying out shot blasting pretreatment on the surface of the coating by utilizing a sand blasting machine, large weakly bonded particles caused by poor atomization effect in a surface spraying process are removed; shot blasting treatment is carried out on the surface of the coating by adopting the sand blasting machine, and compaction is carried out on the coating, and the method for improving the wear-resistant anti-corrosion property of the coating of the heating surface of the boiler has the characteristics that a technology is simple and performance is obviously improved. Compared with the traditional electric arc spraying coating, a metal coating or a metal ceramic coating treated by adopting the method provided by the invention has low porosity and high bonding strength, and corrosion prevention and wear-resisting properties of the coating are improved.
Owner:XIAN THERMAL POWER RES INST CO LTD

Arc heater water leakage fault diagnosis system based on atomic emission spectroscopy

The invention discloses an arc heater water leakage fault diagnosis system based on atomic emission spectroscopy. The air is heated by an arc heater and expanded and accelerated by an effuser to formhigh temperature air flow. The flow field spectrum formed by the arc heater is focused by a spectrometric compression film. The focused flow field spectrum is transmitted to a spectral measurement module through an optical fiber. The spectral intensity of the oxygen atomic characteristic spectrum and the spectral intensity of the background spectrum are measured by using the spectral measurement module and then the relative intensity is calculated. The relative intensity is compared with the intensity threshold by a data processing terminal, and the water leakage fault of the arc heater is judged according to the comparison result. When the judgment result indicates water leakage, power supply to the arc heater is disconnected. Rapid diagnosis of the low enthalpy arc heater water leakage fault can be realized so that safe operation of the heater can be guaranteed; and the operation state of the heater can also be monitored in real time so as to provide reference to analysis of the long-term operation stability.
Owner:CHINA ACAD OF AEROSPACE AERODYNAMICS

Management system for compound rainwater in residential area

The invention discloses a management system for compound rainwater in a residential area. The management system comprises a rainwater hopper (1), a rainwater filtering device (2), a rainwater processing device (3) and a storage clean water tank (7), wherein the rainwater hopper (1) is arranged on a roof and is used for collecting the roof rainwater; the rainwater processing device (3) comprises a cylindrical separating bin, a spiral settling pond (4) and an absorbing plate (5); the spiral settling pond (4) is arranged at the bottom in the separating bin; the absorbing plate (5) is arranged at the center in the separating bin; the rainwater filtering device (2) is communicated with the spiral settling pond (4); water after entering into the storage clean water tank (7) and being treated is communicated with a domestic water pool (9) through a water pump (8). The management system for compound rainwater in the residential area integrates the functions of collecting, purifying, storing and dispatching rainwater and using rainwater for sprinkling green belt. The system has the advantages that the device volume is not large, the cost is low, the address selection and management are easy and the problem of shortage of urban domestic and fire-protection water is effectively solved.
Owner:SHANGHAI JIANGJIAN IND CO LTD

Self-locking U-shaped wire clamp

A self-locking U-shaped wire clamp comprises a clamping plate and at least two U-shaped clamps, wherein wire clamping parts are arranged at bending positions of the U-shaped clamps, two side rods are locking rods, at least two pairs of locking holes corresponding to the locking rods are formed in the clamping plate, the U-shaped clamps are in parallel, the locking rods respectively and perpendicularly penetrate through the locking holes in the clamping plate, non-return valve teeth are arranged on the locking rods, movable locking blocks are arranged at side edges of the locking holes, locking teeth matched with the non-return valve teeth are arranged on the locking blocks, and the other ends prop against locking springs. During operation, the clamping plate is attached onto one side of a porcelain disc, a cable is attached onto the other side of the porcelain disc, the self-locking U-shaped wire clamp is automatically locked after the U-shaped clamps are inserted into the clamping plate, so that the cable is locked on the porcelain disc and is not liable to loose; and when the self-locking U-shaped wire clamp is needed to be opened, only the locking springs are needed to be pressed to make the locking blocks retrieved, the U-shaped clamps can be freely taken out of the clamping plate, so that the cable is loosen, the self-locking U-shaped wire clamp is very convenient to operate and use and is particularly and suitably used for overhead cable construction.
Owner:广州勇艺邦电子科技有限公司

Mortar-free self-embedded masonry structure system and building comprising system

InactiveCN104141358AIncreases construction speedLow costWallsShock proofingRebarStructure of the Earth
The invention provides a mortar-free self-embedded masonry structure system and a building comprising the system. The mortar-free self-embedded masonry structure system comprises a plurality of standard building blocks, a plurality of corner building blocks, a plurality of mold plate building blocks, a plurality of corner mold plate building blocks and a plurality of half building blocks, wherein the building blocks are connected in a mode that grooves are matched with flanges. Reinforced steel bars can be preset into the building blocks and concrete can be filled so as to improve the integrality and the anti-seismic property of a wall body. Compared with the prior art, the system changes the geometric construction of the building blocks, the building blocks can be embedded into and fixed with one another in the transverse direction, the vertical direction or both directions, and mortar is not used in the construction process. As the building blocks are embedded into and fixed with one another, the speed in building the wall body is increased; ring beams and cross beams can be cast for the mold plate building blocks, so that additional mold plates are avoided. Because of the comprehensive factors, compared with a conventional building, the building system is fast in construction speed, low in manufacturing cost, relatively low in requirement on special skill of workers and is particularly applicable to construction of villages and small towns with underdeveloped economics.
Owner:SHANGHAI JIAO TONG UNIV

Multi-layer aeration combined film body for performing heat preservation on building

The invention discloses a multi-layer aeration combined film body for performing heat preservation on a building. The combined film body comprises at least four layers of flexible films, wherein an inter-film layer is formed between every two adjacent layers of flexible films; aeration pipes connected with the flexible films are arranged in the inter-film layers; aeration side frames are formed by aeration pipes positioned at the peripheries of the inter-film layers; aeration ribs are formed by aeration pipes positioned between the aeration side frames; a space in each inter-film layer is separated into a plurality of communicated core part chambers by the aeration ribs and the aeration side frames which are positioned in the same inter-film layer; the aeration pipes are respectively communicated with an air tap; and the air tap is fixed on the combined film body. The combined film body is energy-saving and environment-friendly, has obvious heat-preservation and thermal-insulation effects, and the heat preservation performance of the building can be improved; and the combined film body is simple in manufacturing process and low in cost, and can be conveniently manufactured on a large scale, the building cost can be reduced, the manufacturing difficulty is reduced, and the combined film body is low-carbon, environment-friendly and renewable and can be recycled.
Owner:TIANJIN UNIV RES INST OF ARCHITECTRUAL DESIGN & URBAN PLANNING +1

Asphalt polyurethane waterproof coating suitable for cement base layer and preparation method and application of asphalt polyurethane waterproof coating

The invention discloses an asphalt polyurethane waterproof coating suitable for a cement base layer and a preparation method and application of the asphalt polyurethane waterproof coating. Raw materials of the asphalt polyurethane waterproof coating comprise asphalt, a compatilizer, a water removal agent, a catalyst, filler and a terminated polyurethane prepolymer, wherein the terminated polyurethane prepolymer is prepared through a reaction of a compound which is shown in a formula (I) and a polyurethane prepolymer, and the terminated polyurethane prepolymer contains no isocyanate-terminatedgroups; and the preparation method comprises the following steps: preparing the terminated polyurethane prepolymer firstly, and then mixing the terminated polyurethane prepolymer with the remaining raw materials so as to obtain the coating. The invention further discloses application of the waterproof coating in construction of an asphalt waterproof coiled material on the cement base layer. The waterproof coating has a safe preparation process, the coating can be coated directly on the cement base layer with high content of water when the coating is in use, and a reaction is performed betweenthe hydrolyzed coating with silicate in the cement, so that the bonding force on the wet base layer is improved; and excellent bonding strength can be formed between the coating and the asphalt waterproof coiled material, particularly a short time of surface drying and hard drying and moderate viscosity are achieved, the heating step before construction can be avoided basically, and on-site construction is facilitated.
Owner:JIANGSU CANLON BUILDING MATERIALS

Rotation V-type T-structure bridge pier and construction thereof

The invention relates to a rotation V-type T-structure bridge pier and a construction thereof. When an included angle formed between a line and an existing busy trunk line through vertical crossing is smaller, cross-hole arrangement of a bridge is more difficult. The bridge pier is constructed on one side of the existing trunk line, and comprises a pile foundation, a supporting platform, pier arms and a cover beam from bottom to top, wherein the supporting platform is divided into a lower rotary table and an upper rotary table from bottom to top; a rotary spherical hinge is arranged between the upper rotary table and the lower rotary table; during line operation skylight time, the upper rotary table and the structure rotate to a designed position by taking the rotary spherical hinge as the center, concrete on the outer side of the rotary spherical hinge is poured to form a solid stage, and the lower rotary table and the upper rotary table are fixedly connected together to complete construction. Due to the adoption of a rotation V-type T-structure scheme, the construction only needs to be performed on one side of the existing line, requirements for roads and construction sites on the other side are reduced, the conditions that houses on two sides of the existing line in an urban area are dense and are difficult to remove are facilitated, the removal cost is greatly reduced, and the construction period is guaranteed; meanwhile, due to the adoption of rotation construction, the influence on operation of the existing line is minimized.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP

Assembled capping beam construction safety protection integrated platform

The assembled capping beam construction safety protection integrated platform comprises a construction platform body, a guardrail is arranged on the top face of the construction platform body, and longitudinal channel steel and transverse channel steel are arranged on the bottom face. The transverse channel steel is fixedly connected with first telescopic rods through vertical positioning steel bars, each first telescopic rod comprises a groove-shaped rod section and a flat rod section, and the four first telescopic rods form a rectangular telescopic frame body through fastening bolts; secondtelescopic rods are riveted to the bottom faces of the first telescopic rods through first telescopic supporting arms, and the four second telescopic rods form a rectangular telescopic frame through fastening bolts. The first telescopic rod is riveted with a first hoop through a second telescopic supporting arm, and the second telescopic rod is riveted with a second hoop through a third telescopicsupporting arm. The double-hoop supporting structure is constructed, the concept of traditional hoop method capping beam construction is overturned, platform bearing is converted into transverse external pressure on the hoops, the static friction force between the hoops and the pier is greatly improved, the bearing capacity and safety of the platform are improved, and the platform is suitable forcapping beam construction of high piers.
Owner:ANHUI HIGHWAY BRIDGE ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products