Fabrication and installation process of round heavy-duty steel funnel embedded parts
An installation process and a technology of embedded parts, which are applied in the direction of construction, building structure, and building materials processing, etc., can solve the problems that the circular embedded parts cannot be installed as a whole, cannot guarantee the construction quality, and the construction efficiency is low, so as to achieve saving Machinery and manpower, reduced construction costs, good overall effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] A production and installation process of a circular heavy-duty steel funnel embedded part, which is completed according to the following steps: ① Divide the entire circular embedded part into two semicircles A and B; ② Prefabricate the two semicircular embedded parts Assembling, the error after pre-assembly is controlled below 2mm, which is convenient for the quality assurance of the later installation of embedded parts; ③ Weld the shear anchor fluke 2 on the pre-assembled circular embedded part 1, and the welding method of the shear anchor fluke adopts the same Directional symmetrical intermittent welding to reduce creep caused by welding stress (such as figure 1 , 2 shown); ④ Install the embedded part of the welded shear anchor fluke to the predetermined position and reinforce it (such as image 3 shown); ⑤ install the tensile anchor fluke 3 in the anchor fluke hole 4 made in advance from the outside to the inside, and then weld and polish it (such as Figure 5 , 6...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 