Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for improving safety of CTCS-3 (Chinese train control system-3) train control system

A technology of CTCS-2 and train control system, which is applied in the direction of transportation center control system, railway signal and safety, railway car body components, etc., can solve problems affecting driving safety, etc., and achieve the effect of improving safety and accurate calculation results

Active Publication Date: 2013-11-13
BEIJING JIAOTONG UNIV
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Because the single control unit is affected by the system structure, sensor device limitations and environmental interference in the train control data collection, processing and transmission links, there are data uncertainties and credibility risks, which affect driving safety

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for improving safety of CTCS-3 (Chinese train control system-3) train control system
  • Method for improving safety of CTCS-3 (Chinese train control system-3) train control system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] The preferred examples will be described in detail below in conjunction with the accompanying drawings. It should be emphasized that the following description is only exemplary and not intended to limit the scope of the invention and its application.

[0021] The basic principle of train monitoring is to use the train control system to calculate the allowable speed of the train in real time and generate a monitoring curve during the running of the train. Speed, the train is safe; otherwise, when the actual running speed of the train is greater than the allowable speed, the train control system will output braking. When calculating the allowable speed and generating the monitoring curve, four types of data are needed: driving permit information, line description information, temporary speed limit data and train parameters (train load, length, braking rate, etc.). Because the train data is fixed for each train and does not need data fusion, while others need to be provid...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for improving the safety of a CTCS-3 (Chinese train control system-3) train control system in the technical field of railway safety running control. The method comprises line description information fusion, driving license information fusion and temporary speed limitation data fusion, wherein the line description information fusion is as follows: the comparison of line description information received by a CTCS-2 and a CTCS-3 is performed, if the results are consistent, the allowable speed is calculated directly, otherwise, the allowable speed is calculated by safety data; the driving license information fusion is as follows: when the range of a driving license of the CTCS-3 is larger than 7 rail circuit sections and the CTCS-2 gives out an upper limit of idle rail circuit sections, the allowable speed is calculated according to the driving license; and the temporary speed limitation data fusion is as follows: temporary speed limitation messages received by the CTCS-2 and the CTCS-3 are compared, if the results are consistent, the allowable speed is calculated directly, otherwise, the allowable speed is calculated by favorable data. With the adoption of the method, the accuracy and the credibility of the calculation results can be improved, thereby being conductive to safety running of trains.

Description

technical field [0001] The invention belongs to the technical field of railway safety operation control, and in particular relates to a method for improving the safety of a CTCS-3 train control system. Background technique [0002] With the opening of the Beijing-Tianjin Passenger Dedicated Line on August 1, 2008, in just two years, a number of passenger dedicated lines with a speed of more than 300km / h have been put into operation one after another in China, which marks that my country has entered the stage of becoming a high-speed train power. ranks. In order to meet the needs of the development of high-speed trains, my country has formulated the "China Train Control System CTCS (Chinese Train Control System) Development Plan", combined with the current situation of China's train control and future development needs, the Chinese train control system is divided into CTCS-0 to CTCS- 4 five levels. Among them, CTCS-2 is suitable for controlling trains with a speed of 200km / h ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B61L27/00
Inventor 王俊峰
Owner BEIJING JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products