Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for mounting large-size discharging platform

An installation method and platform technology, applied in the directions of loading/unloading, transportation and packaging, and processing of building materials, etc., can solve the problems of increasing the difficulty of construction quality control, not being able to seal immediately, increasing the use time of cranes, etc., to achieve height adjustment The effect of safety and construction quality, simple installation method and wide application range

Inactive Publication Date: 2012-10-10
COSCO DALIAN SHIPYARD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the gradual development of the world's deep-sea oilfields, the demand for floating production, storage and offloading units (FPSO) and other offshore products in the international market is increasing. It is converted from a tanker. In the supertanker conversion (FPSO) process, adding a new unloading platform to the extension of the bow deck on the ship is always one of the important projects in the conversion of the floating production storage and offloading unit (FPSO). The weight of the general unloading platform is 150-230 tons, in the process of supertanker conversion floating production storage and offloading (FPSO) in the past, the installation of the unloading platform was mainly carried out by large floating cranes. Due to the change of the line type at the head and tail, the installation process required a large range of repairs and adjustment, the sealing cannot be carried out immediately, and the crane can only be allowed to loosen the hook until the sealing is completed. The installation process of the first unloading platform takes 2-3 days, which will greatly increase the use time of the crane, and at the same time work at night, which reduces the The safety of construction and the difficulty of construction quality control have increased. In order to reduce production costs, improve production efficiency and construction safety, a scientific, reasonable and safe installation method design is essential

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0013] The installation method of the large-scale unloading platform of the present invention is mainly completed through the following steps: A, according to the structural characteristics of the first unloading platform structure itself, weight, center of gravity, and installation position, two heights are designed through strength checking and calculation and are 5 meters. 2 load-bearing tripods, weld the tooling bracket to the designated position on the bow deck, and install the load-bearing tripod to the designated position on the hull plate at the bottom of the unloading platform; B. According to the installation position of the tooling bracket, install 4 traction adjustment lifting lugs at the designated position According to the weight, center of gravity and structural characteristics of the unloading platform, install 4 pieces of lifting lugs on the deck of the unloading platform; C. According to the position of the tooling bracket, the position of the traction lifting ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for mounting a large-size discharging platform, comprising the following steps of: A. designing a tooling bracket and a bearing triangular bracket according to the self structure, the weight, the gravity center and the mounting position of the discharge platform, welding the tooling bracket at the designated position of a deck and mounting the bearing triangular bracket at the designated position of an outer board of a ship body at the bottom of the discharging platform; B. mounting a drawing and adjusting lifting lug at the designated position and arranging ahoisting lifting lug on the deck of the discharging platform; C. assembling a steel wire rope, a chain block and different shackles together; and D. hoisting a discharging platform structure to a mounting position, connecting the shackles connected with the chain block on the ship with the drawing and adjusting lifting lug on the discharging platform, tightening the chain block and releasing a hook of a hoist. According to the method for mounting the large-size discharging platform, the use time of hoisting on the sea is greatly shortened, the safety for the mounting process is improved, the time for using the hoist is shortened to 4-6 hours from 2-3 days, the cost is saved and the service efficiency of hoisting resources is improved.

Description

technical field [0001] The invention relates to the field of floating production, storage and unloading devices refitted from supertankers, in particular to an installation method of a large unloading platform. Background technique [0002] With the gradual development of the world's deep-sea oilfields, the demand for floating production, storage and offloading units (FPSO) and other offshore products in the international market is increasing. It is converted from a tanker. In the supertanker conversion (FPSO) process, adding a new unloading platform to the extension of the bow deck on the ship is always one of the important projects in the conversion of the floating production storage and offloading unit (FPSO). The weight of the general unloading platform is 150-230 tons, in the process of supertanker conversion floating production storage and offloading (FPSO) in the past, the installation of the unloading platform was mainly carried out by large floating cranes. Due to t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B65G69/22E04G21/14
Inventor 曹凯张平于海涛张延年
Owner COSCO DALIAN SHIPYARD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products