Large-sized box jacking control construction method capable of enhancing accuracy
A construction method and large-scale technology, applied in the field of large-scale box jacking control construction, can solve problems affecting train safety, large-scale box weight, and affecting engineering quality, so as to ensure accuracy, improve bearing capacity, engineering quality and safety good sex effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The construction method for controlling the jacking of a large box with improved precision provided by the present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0026] Such as Figure 1-Figure 8 As shown, the large-scale box body jacking control construction method that can improve the accuracy provided by the present invention includes the following steps carried out in order:
[0027] 1) First determine the position and size of the foundation pit on the foundation of the railway 1 side where the frame bridge needs to be laid; the length direction of the foundation pit should be consistent with the jacking direction of the large box body 10.
[0028] 2) A plurality of cement mixing piles 3 are arranged in the vertical direction in the foundation pit, and the top of the cement mixing pile 3 near the edge of the railway 1 forms a slope 4 that is high on the outside and low on the inside. The heights...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com