A super-long pcc pile formwork double-layer sleeve connection section and sinking connection method
A double-layer casing and connecting section technology, applied in sheet pile wall, construction, infrastructure engineering and other directions, can solve the problems of lack of sealing, increased wall thickness, complicated disassembly, etc., to achieve convenient transportation, reduce filling coefficient, Ingenious effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] Such as figure 1 As shown in the present invention, a method for connecting super-long PCC pile formwork double-layer casing connecting sections of the present invention uses the connection method of inner length and outer shortness, first inside and then outside to realize the pile form connection, including technical steps: (a) pile The mold is in place, (b) align the inner tubes (1), (c) install the first inner tube connecting plate 8, (d) install the remaining inner tube connecting plates 8, (e) install the first outer tube connecting plate 10 , (f) install the rest of the outer tube connecting plate 10.
[0031] Such as Figure 2~Figure 6 As shown, the connecting section of the double-layer casing of the pile form is a double-layer concentric steel casing including an inner pipe 1 and an outer pipe 2, and a transverse support 3 is arranged between the inner pipe 1 and the outer pipe 2 to fix the pile formwork. The lateral supports 3 can be short steel pipes, and ...