Information system disaster recovery time objective calculation method
Patent Information
- Authority / Receiving Office
- CN Β· China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- BEIJING UNIV OF POSTS & TELECOMM
- Publication Date
- 2014-12-10
- Estimated Expiration
- Not applicable Β· inactive patent
Smart Images
Figure 1
Abstract
Description
Technical field
[0001] The invention relates to a method for calculating the disaster recovery time target of an information system, which can scientifically calculate the disaster recovery points needed in the disaster recovery construction of the information system by analyzing the CPU load, business volume and related data of the existing business system Target (RTO: RecoveryTime Object) indicator. Background technique
[0002] According to the definition in the national standard "Information System Disaster Recovery Specification" (GB / T20988-2007): a disaster refers to a serious failure or paralysis of an information system due to man-made or natural reasons, which makes the business function or service level supported by the information system stop Unacceptable, unexpected events that reach a specific time. Typical disaster events include natural disasters (such as fire, flood, earthquake, wind disaster, etc.), equipment disasters (such as equipment failure, software error,...