Building jacking deviation rectifying method
A building and deflection correction technology, which is applied in the direction of building construction, construction, building maintenance, etc., can solve the problems of foundation rebound and decline, and achieve the effect of ground elevation recovery, high success rate, and accurate control of jacking volume
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] The present invention will be further described below in conjunction with the accompanying drawings.
[0019] This embodiment is to rectify the cracking of the wall caused by the uneven settlement of one side in a building.
[0020] First, estimate the required jacking amount according to the inclination of the wall, for example, the jacking amount is 350mm. Then excavate the pilot pit, compare figure 1 , excavate a pilot pit 3 on the outdoor floor 1 of the wall foundation 4 to be rectified, expand from the pilot pit 3 along the lateral direction of the wall foundation, and continue to excavate downwards to the bearing layer along the vertical bottom of the foundation, at this time An underpinning tunnel 5 is formed under the foundation; concrete underpinning pile piers 6 are poured in the underpinning tunnel 5 until the upper end surface of the underpinning pile pier 6 is 500 mm from the lower end surface of the building foundation. After the pouring of the underpinn...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 