Self-elevating rotating crane installation device for tall towers
An installation device and self-elevating technology, which is applied to cranes and other directions, can solve the problems of not too many large-scale hoisting machines, long construction period, and restrictions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] It is mainly composed of a central cylinder 1, a main mast 2, and an auxiliary mast 3. It is characterized in that the main mast 2 is located on the top of the central cylinder 1, and the connection between the main mast 2 and the central cylinder 1 is provided with a plane thrust ball bearing 4. The main mast 2 and the plane The thrust ball bearing 4 is fixed on the top plate 5 of the central cylinder 1 through nuts 19, the main mast 2 is connected with the auxiliary mast 3, the central cylinder 1 is connected with the tower beam 6, a ladder 7 is arranged on the central cylinder 1, and a ladder 7 is arranged on the central cylinder. 1 is provided with an operation hole 8 on the cylinder, and a platform 9 is arranged inside the central cylinder 1. The position of the platform 9 is adapted to the operation hole 8, and an operation platform 10 is provided on the outer edge of the top of the central cylinder 1.
[0023] The connection between the main mast 2 and the top pla...
Embodiment 2
[0028] The present invention makes full use of the structural characteristics of the tower to make a φ1520mm×6mm steel coil pipe with a length of 17m as the support of the center tube. Use a crane to hoist the lower central tube 1 into the tower, center it with the adjusting screw 15, connect the central tube 1 with the tower beam 6 on the tower 22 with a corbel and fix it firmly, and then hoist the upper section into the tower and the lower section After connecting and fixing, the top platform and mast are installed; the 3-ton hoist is in place on the ground, fixed, and threaded with wire ropes; A Φ219×10 high 6m seamless steel pipe is erected on the top of the central tube 1 as the main mast 2, and a Φ159×10 long 6m seamless steel pipe is used as the auxiliary mast 3. Two pairs of planar thrust ball bearings 4 are installed at the bottom of the main mast 2, and the bearings 4 and the main mast 2 are fixed on the top plate 5 of the center tube 1 with special nuts 19 and lock ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com