Embedded construction prefabricated pile following device and pile following method
A prefabricated pile and embedded technology, which is applied in the direction of sheet pile wall, foundation structure engineering, construction, etc., can solve the problems that the clamp and the pile are difficult to separate and construction is difficult
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0036] Such as Figure 1 to Figure 5 As shown, a buried construction prefabricated pile delivery device of the present invention includes a clamp 1 and at least one clamping block 2, and the upper part of the clamp 1 is provided with a connecting arm 11 that can be connected with the drill pipe of the pile driver. And the lower part of the hoop 1 is provided with a hoop hole 12 that can match the outer peripheral surface of the embedded construction prefabricated pile. The hoop hole 12 extends to the middle of the hoop 1; The upper part of the hole 12 is formed with a clamping groove 13 that can be fitted with the clamping block 2. The upper part of the embedded construction prefabricated pile extends into the hoop hole 12 and rotates, and the clamping block 2 is clamped in the clamping groove 13, so that the embedded Type construction prefabricated pile is fixedly matched with clip 1.
[0037] In the embodiment, the number of clamping blocks 2 is four, and correspondingly, t...
no. 2 example
[0053] The quantity of the card block 2 is one. The center of the clamping block 2 is located on the axis of the pile, so when sending the pile, the pile will not be inclined due to the weight. The parts not described are the same as the first embodiment.
[0054] The invention has the advantages of being able to implant the embedded construction prefabricated pile into the pile hole, reliable operation and simple structure.