Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

92results about How to "Easy construction management" patented technology

(Building Information Modeling) BIM based plan graph and first view-angle split-screen synchronous display method and system

The invention provides a BIM based plan graph and first view-angle split-screen synchronous display method and system. The method comprises loading and displaying a BIM stereo model; matching a navigation norm with a model bearing; generating a corresponding plane graph and placing a virtual camera; generating a corresponding first-person view-angle graph according to the camera position and view-angle information; displaying the view-angle bearing through the navigation norm visually, and providing a compass function; adjusting the view angle of the first-person view-angle graph according to user instructions, an adjusting the projection view angle direction of the virtual camera in the plane graph according to current view-angle data; and using the plane graph and the virtual camera projection as one portion and the first-person view-angle graph as the other portion to be displayed synchronously in a same screen. By means of the method and the system, a plane drawing and the first-person view-angle stereo graph are combined, the model bearing and the compass are combined, and accordingly, detail members can be observed and searched visually, the site actual engineering member and model member matching problem can be determined visually, construction management is facilitated, the requirement for the personnel technology is reduced, and even general workers can observe, record and search for the detail members according to images displayed on the same screen.
Owner:SHANGHAI TONGZHU INFORMATION TECH

Integrated oxidation ditch, construction and operation method

The invention discloses an integrated oxidation ditch and a construction and operation method thereof. The construction and operation method has the technical proposal that the integrated oxidation ditch is divided into an anoxic zone, an anaerobic zone and an aerobic zone, which are communicated mutually, the anoxic zone and the anaerobic zone are arranged at one end of the integrated oxidation ditch in common, the aerobic zone is arranged at the other end of the integrated oxidation ditch, and a water-retaining wall is arranged at the middle part of each zone to cause each zone to be formed a single annular channel, water inlet pipes used for feeding water by the division point way are arranged at the anoxic zone and the anaerobic zone, an aeration device is arranged in a circulation channel at one side of the aerobic zone communicated with the anoxic zone, and a mud-water separation device used for the mud-water separation and the water emission is built on the side wall of the aerobic zone for the water emission. The aeration device is started, and the sewage passes through the anoxic zone, the anaerobic zone, the aerobic zone, and the mud-water separation device in sequence, so the dephosphorization and the denitrification as well as the decarbonization treatments of the sewage are realized. The integrated oxidation ditch has the advantages of simple structure, lower cost, small occupation area, and good sewage treatment effect, and can particularly and effectively perform the dephosphorization and the denitrification simultaneously.
Owner:ARCHITECTURAL DESIGN RES INST OF GUIZHOU +1

Gob-side entry retaining Y-type ventilation high-position return airway drilling gas extracting method

ActiveCN103758559AThe extraction roadway is used as a working face for long-term and high-efficiency miningLong-term and efficient miningGas removalConstruction managementCoal
A gob-side entry retaining Y-type ventilation high-position return airway drilling gas extracting method includes: constructing connecting roadways at intervals between a rail roadway top pumping roadway and a rail roadway; building a filling wall along the edge of a gob during extraction to retain the rail roadway, allowing a transportation roadway and the rail roadway to perform work face air intaking and a rail roadway retained roadway section, the connecting roadways and the rail roadway top pumping roadway to perform air returning so as to form a gob-side entry retaining Y-type ventilation system, and secondarily using the rail roadway top pumping roadway as the high-position air returning roadway; performing gas extracting drilling on adjacent coal beds and gobs in the high-position air returning roadway, and extracting gas. By the method, the drilling requirements on retaining roadway section can be lowered, mutual interference of drilling and work face extraction, and construction management is facilitated. Due to the fact that the high-position air returning roadway is far away from the work face mining motion influence, the mining motion interference on drilling is lower than front and rear drilling of the retained roadway, easy drilling maintenance is achieved, and efficient and long-term gas extraction can be achieved.
Owner:CHINA UNIV OF MINING & TECH

Distributed flexible control method suitable for city long tunnel

The utility model relates to a distributing type flexible control method which is applicable to the long tunnel in the city. The utility model is composed of a upper network and a lower network and characterized in that the upper network is in the central control room of the system to control the operation of the lower control flow, the data handling, the storage, the display, the alarming, the report generation as well as the data from some data management stations and the analytic system operating stations; the lower network introduces the can concentric line so as to integrate a plurality of PLC into the can bus network. PLC realizes the analog collection and the logic control. The collected data is delivered the upper network via the can concentric line; the upper network sends out the control command to PLC which carries out the relevant operation as per the order received. The optical fiber is used as the transmission medium between the upper network and the lower network. For the utility model, each test point is controlled by one PLC and then re-concentrated to the central control room. Thus, the method is almost isolated from the civil work construction, so as to facilitate the construction management for the long tunnel monitored control system in the city.
Owner:WUHAN UNIV OF TECH +1

Construction method for prestressed concrete floor slab reserved with water-heating pipeline well opening

The invention discloses a construction method for a prestressed concrete floor slab reserved with a water-heating pipeline well opening, which comprises the following steps of: A, manufacturing a corresponding quantity of embedded sleeves; B, dividing a plurality of iron rod pieces into an upper layer and a lower layer to weld the embedded sleeves into embedded pieces; C, accurately setting out on a laid floor slab mould, and marking the central position of water supply and drainage pipes in the water-heating pipeline well by paint; D, carrying the embedded pieces to the floor slab mould and fixing the embedded pieces firmly; E, inserting prestressed reinforcing steel bars among the embedded pieces; F, performing the acceptance of concealed work; and G, pouring concrete. The invention overcomes a plurality of inconveniences of prestressed reinforcing steel wires, solves the problem that the water-heating pipeline well cannot be reserved as unbounded prestressed concrete steel bars pass through the water-heating pipeline well floor slab, guarantees high accuracy of the reserved pipeline position in the water-heating pipeline well, simplifies operation rules, saves cost and reduces labor intensity, saves a lot of effective time for an project with a limited construction period and a construction process insertion, and simultaneously brings a great of economic benefits.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Pressure testing device and method for cleaning pipeline

The invention discloses a pressure testing device and method for cleaning a pipeline, for solving the problems of high workload, low construction efficiency and potential safety hazards caused by repeated welding of the pipeline in the pipeline cleaning and pressure testing work. The pressure testing device comprises two pressure testing heads, wherein the two pressure testing heads are respectively connected to the two ends of the pipeline; each pressure testing head comprises a drum body; one end of the drum body is used for connection with the pipeline, and the other end of the drum body is provided with a matched blind plate; the drum body is internally provided with an anti-collision air bag which is close to the blind plate; the upper part of the drum body is provided with an opening for entering and exiting of compressed and air, and the lower part of the drum body is provided with a sewage outlet; and a pipe cleaner is arranged in the drum body in a matching manner. The pressure testing device disclosed by the invention is arranged on the pipeline, then the procedures of cleaning the pipeline, measuring the diameter and testing the pressure and the like can be finished, the workload is reduced and the safety performance is improved simultaneously.
Owner:CHUANZHONG BRANCH KEHONG GASOLINEEUM NATURAL GAS ENG SICHUAN

Method and device for automatically generating three-dimensional decoration line construction scheme

The invention relates to a method and a device for automatically generating a three-dimensional decoration line construction scheme. The method comprises the following steps: providing a 2D drawing tool, drawing a 2D house plane structure diagram by utilizing the tool, marking related house structure information, and designing the clear height and height drop of each room; after drawing, carryingout switching between 2D and 3D to automatically generate a 3D room type and restore a real room type; arranging all types of points needing to generate a line in the generated house structure to restore real positions, mainly including the points of the following structural lines; after completing the point design, providing a relationship design module in a platform, and then setting a relationship between a designated device and a corresponding controlled device through mouse click operation; after obtaining position information and rule information, generating a line automatically in the room type drawn in step S1, and providing operation tools for adjustment and modification; and after generation of the line, generating a line system scheme automatically. The method and the device provided by the invention have the advantages of operation detection and convenient construction.
Owner:苏州织巢信息科技有限公司

Tunnel pre-stressing forceinverted arch structure and construction method thereof

The invention discloses a tunnel pre-stressing force inverted arch structure, and further discloses a construction method of the pre-stressing force inverted arch structure. The tunnel pre-stressing force inverted arch structure comprises the an inverted arch body, pre-stressing force components which apply pre-tension to the inverted arch body are arranged in the inverted arc body in the direction of the axis of a tunnel at intervals, and the fixing ends and stretch-draw ends of the pre-stressing force components are connected with short side walls on the two sides of the inverted arc body. According to the tunnel pre-stressing force inverted arch structure and the construction method of the pre-stressing force inverted arch structure, the pre-stressing force components are pre-buried inan inverted arch for the first time, a novel thought is provided for solving the problem that the tunnel inverted arch is prone to cracking, that is to say, pre-stressing force ribs are arranged in the tunnel inverted arch, pre-tension force is exerted, tensile stress which is caused by outside load is completely or partly offset through the pre-tension force, cracking of the inverted arch and uplifting of floor are improved and postponed, and the tunnel pre-stressing force inverted arch structure and the construction method of the pre-stressing force inverted arch structure are suitable for inverted arch protection of high-crustal-stress tunnels or foundation base softening tunnels.
Owner:CENT SOUTH UNIV

Cable 'disc-fixing and scale-fixing' laying system

The present invention provides a cable 'disc-fixing and scale-fixing' laying system. The system comprises an arrangement module, an introduction module configuration module and a model establishing module. The 'disc-fixing and scale-fixing' cable laying technology is employed, the laying processing and the management level are better than construction projects at the same periods. Cables at a whole plant realize 'full life cycle' management through the full three-dimensional digital power plant model technology. The cable laying 'disc-fixing and scale-fixing' optimization process considers optimization management such as the design selection, design changing amount, the bid amount, the production-manufacturing amount, the construction amount, the contract ordering amount and the stock amount, etc. the recording, the comparison and the summary are realized, and it is realized that a single engineering does not exceed budgetary estimation, and finally the control target is achieved that the actual settlement amount degree of the engineering cables and the bridges is lower than the engineering preliminary design budgetary estimation. The cable laying 'disc-fixing and scale-fixing' optimization management prompts the cable supply, storage and construction management and avoids the problems that hidden joints are disposed between the laying cables, there are many head missing phenomenons in the cable laying, and the cable laying results in wasting, etc.
Owner:大唐贵州兴仁发电有限公司

Special building block for anti-seismic energy-saving reinforced masonry of well-off building and new construction technology

InactiveCN103334534AAccurate binding and positioningImprove the mechanical properties of masonryConstruction materialWallsMortise and tenonInsulation layer
The invention discloses a special building block for an anti-seismic energy-saving reinforced masonry of a well-off building and a new construction technology. The special building block is characterized in that tenon-and-mortise location can be achieved at the wall end of a block body, the middles of walls are only provided with half ribs the heights of which are reduced by half, and the inner walls of the two walls are provided with back-draft vertical rib grooves; the block body is additionally provided with an aluminum foil sandwich insulating layer with an air space layer and an aluminum foil outer heat insulation layer, cleaning ports are not formed in the walls, the long vertical ribs can be vertically connected in advance, then the building block is built while horizontal and perpendicular ribs are tied, filling is carried out while the concrete is vibrated, and the whole process is visually constructed; the problem of the reinforced masonry in the existing rule can be fully solved, the cleaning ports are not formed in the wall foot so as not to be required to be blocked, dust can be removed from the seams when falling in a construction process, longitudinal ribs are not required to be inserted from the top of the wall to a dark hole the hole diameter of which is 12cm and the depth of which is 2-3 meters, and the situation that upper and lower rebars are lapped in the cleaning ports after connecting rebars are inserted can be avoided; a condition that a cavity is formed by arching of the blocked concrete due to the deep hole can be avoided, a situation that uniformity and density of the concrete are hardly ensured caused by the factor that a vibrator is hard to insert to the bottom of the deep hole, a new construction method can ensure visual operation and supervision, hidden dangers in construction are eliminated, and the quality of construction is guaranteed.
Owner:刘亦宽

Construction method for prefabricating directly-buried uncompensated centralized heat supply pipeline by electrically preheating

The invention relates to a construction method for prefabricating a directly-buried uncompensated centralized heat supply pipeline by electrically preheating. The method comprises the following steps of: (1) grooving, adjusting the coordinate and scale height of the heat supply pipeline, and computing the preheating temperature and the designed elongation of the heat supply pipeline; (2) controlling the sand refilling height at a half to three quarters of the pipeline height H; (3) connecting the same-side end of the heat supply pipeline with preheating equipment through a cable respectively, and short-circuiting the other side of the heat supply pipeline through a cable; (4) arranging temperature sensors on the heat supply pipeline respectively; (5) recording the initial temperature of the heat supply pipeline and the initial position of a measuring point, starting temperature raising, controlling the temperature raising gradient within 1 DEG C per hour, and preserving heat after a preheating temperature is reached; (6) refilling sand into both sides of the heat supply pipeline, tamping, and controlling the preheating temperature within the range of +/-2 DEG C; (7) after the designed elongation is reached, shutting down the preheating equipment; and (8) performing subsequent construction according to the steps (1)-(7). The construction method disclosed by the invention is safe, reliable, easy and practical, is easy for accurately controlling construction equipment, and is consistent with the national policy of energy saving and emission reduction.
Owner:MCC TIANGONG GROUP

Pipeline optimization method based on BIM

The invention discloses a pipeline optimization method based on BIM. The method comprises the following steps of S1, constructing a three-dimensional building model by using BIM software; S2, adjusting the arrangement of pipelines in the building model; S3, coloring the pipelines in different elevation intervals or different net height dimensions in sequence according to colors corresponding to the corresponding heights; S4, compiling nodes for coloring a beam plate structure by utilizing a plug-in dynamo of Revit software, and running the nodes to carry out coloring in sequence according to the colors corresponding to the corresponding heights of beams; and S5, defining a position where the colors in the step S3 and the step S4 are intersected as a net height tension region in the building model, and carrying out optimization and adjustment on the pipelines in the net height tension region in the building model. According to the method, the net height situations of the pipelines are reflected by different colors, so that a net height problem can be rapidly and visually exposed; the visual advantage is more beneficial to cooperative communication of different specialty, and the problems encountered in construction can be prejudged more comprehensively, a space problem which cannot be expressed by a two-dimensional drawing is avoided, and the accuracy and the efficiency of pipeline construction are improved.
Owner:广东天元建筑设计有限公司

Universal wedge-shaped pipe piece ring of shield tunnel with super-small curvature radius

The invention provides a universal wedge-shaped pipe piece ring of a shield tunnel with a super-small curvature radius. The universal wedge-shaped pipe piece ring comprises a pipe piece ring body which is a torus and formed by combining six wedge-shaped pipe pieces in a splicing mode; starting from the 12 o'clock position in a clock mode, the pipe piece ring is evenly divided into 24 scales around the center point of the pipe piece ring clockwise by 15 degrees, and even division line mark numbers of the evenly divided 24 scales are 200-224 scales; in an unfolded plan of the pipe piece ring, the width of the pipe piece ring body corresponding to the even division line mark numbers from 200 to 209 scales is enlarged gradually, the width of the pipe piece ring body corresponding to the even division line mark numbers from 209 to 220 scales is reduced gradually, and the pipe piece ring body corresponding to the even division line mark numbers from 220 to 224 scales is enlarged gradually; various parameters of the pipe piece ring body include wedge amount and are determined according to various concrete parameters of the shield tunnel. The universal wedge-shaped pipe piece ring is simple in structure and convenient to splice, and not only meets the requirement of a straight line segment, but also can be used for a curved segment with the super-small curvature radius.
Owner:中海建筑有限公司

Pre-tensioned and post-anchored prestressed anti-floating anchor rod construction method

InactiveCN109811804ATension lock for easyPrevent floating deformationProtective foundationBulkheads/pilesReinforced concretePre stress
The invention relates to the technical field of prestressed anti-floating anchor rod construction, and discloses a pre-tensioned and post-anchored prestressed anti-floating anchor rod construction method. The pre-tensioned and post-anchored prestressed anti-floating anchor rod construction method comprises the following steps: 1) performing prestressed anchor rod construction; and forming a drilling hole in a soil body by construction, lowering a prestressed anchor rod to drill a hole, and pouring mud in the drilled hole after the prestressed anchor rod is lowered, wherein the prestressed anchor rod comprises an anchor head and a rod body; 2) enabling the anchor head to be positioned out of the drilled hole, and enabling the rod body to be located in the drilled hole; excavating along theperiphery of the anchor head to form a construction groove, and performing reinforced concrete construction in the construction groove to form an anchor pier; 3) tensioning and locking the prestressedanchor rod; and 4) constructing an underground structure above the soil body, and anchoring the anchor head into the underground structure. Therefore, prestressed anchor rod construction, anchor pierconstruction and underground structure construction are not interfered with one other, and construction management is facilitated; tensioning and locking are facilitated, and construction steps are simplified; and moreover, restraining force is generated on the underground structure to prevent the underground structure from floating upwards, and the underground structure is prevented from floating upwards and deforming, so that an anti-floating effect is enhanced.
Owner:SHENZHEN INST OF GEOLOGICAL ENVIRONMENT CO LTD

Layer-quality detection method for rock-fill concrete structure and layer-quality evaluation method for rock-fill concrete structure

The invention discloses a layer-quality detection method for a rock-fill concrete structure and a layer-quality evaluation method for the rock-fill concrete structure and relates to the technical field of the rock-fill concrete structure detection. The detection method comprises the following steps of: establishing a corresponding relation of the number of detection points of elastic-wave data, the impact response intensity of the detection points, average impact response intensity and spatial variability of impact response intensity, and obtaining the layer-quality characteristic of the rock-fill concrete structure. The layer-quality detection method can be used for carrying out nondestructive detection of the rock-fill concrete structure to obtain the layer-quality characteristic of the corresponding rock-fill concrete structure and reflect the layer-quality distribution condition. The evaluation method comprises the following steps of: evaluating the layer quality of the rock-fill concrete structure by utilizing the layer-quality characteristic of the rock-fill concrete structure obtained by the layer-quality detection method for the rock-fill concrete structure. The evaluation method utilizes the spatial variability of impact response intensity obtained by the detection method to draw a spatial curve for evaluation, can be used for controlling the layer quality of a dam and has an important significance for improving the construction quality and optimizing the construction management.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES +3

Spatial-compactness detection method for rock-fill concrete structure and spatial-compactness evaluation method for rock-fill concrete structure

The invention discloses a spatial-compactness detection method for a rock-fill concrete structure and a spatial-compactness evaluation method for the rock-fill concrete structure and relates to the technical field of the rock-fill concrete structure detection. The detection method comprises the following steps of: establishing a corresponding relation of the number of detection points of elastic-wave data, the elastic modulus of the detection points, average elastic modulus and spatial variability of elastic modulus, and obtaining the spatial-compactness characteristic of the rock-fill concrete structure. The spatial-compactness detection method can be used for carrying out nondestructive detection of the rock-fill concrete structure to obtain the spatial-compactness characteristic of the corresponding rock-fill concrete structure and reflect the spatial-compactness distribution condition. The evaluation method comprises the following steps of: evaluating the spatial density of the rock-fill concrete structure by utilizing the spatial-compactness characteristic of the rock-fill concrete structure obtained by the spatial-compactness detection method for the rock-fill concrete structure. The evaluation method utilizes the spatial variability of elastic modulus obtained by the detection method to draw a spatial curve for evaluation, and is conductive to controlling the spatial compactness of a dam, improving the construction quality and bringing convenience for construction management.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES +3
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products