Construction method for prestressed concrete floor slab reserved with water-heating pipeline well opening
A construction method and concrete technology, which is applied to floors, building components, buildings, etc., can solve problems such as low precision and difficult construction, and achieve the effects of simplifying operating procedures, saving effective time, and saving costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0024] The present invention comprises the following steps:
[0025] A. Make a corresponding number of pre-embedded casings according to the required number of plumbing well openings, determine the diameter of the pre-embedded casings according to the diameter of the plumbing well pipes, and determine the length of the pre-embedded casings according to the thickness of the floor. Use chalk to mark the dimension line on the seamless steel pipe according to the size, and the operator cuts the seamless steel pipe into the required length steel pipe section according to the dimension line when cutting;
[0026] B. According to the layout of the plumbing wells in the engineering design, the iron rods are cut into corresponding lengths to make two upper and lower frame structures 2. According to the size of the reserved holes and the specifications and shapes of the water ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com