(Building Information Modeling) BIM based plan graph and first view-angle split-screen synchronous display method and system

A technology of synchronous display and floor plan, applied in special data processing applications, instruments, electrical digital data processing, etc., can solve problems such as inability to view, high cost, and inability to see projects intuitively, to facilitate viewing and operation, and reduce equipment costs. The effect of cost and hardware requirements reduction

Active Publication Date: 2015-07-08
SHANGHAI TONGZHU INFORMATION TECH
View PDF7 Cites 29 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, there are some obvious defects in Revit: 1. The requirements for hardware equipment and technical personnel are very high, resulting in high cost of facilities and personnel; 2. The model in Revit cannot be well combined with the on-site construction management. ;3. It is limited to PC client only, and cannot be viewed on mobile terminals (tablets, mobile phones, etc.)
However, there are still some defects: 1. More monitoring for progress and safety, unable to effectively manage problems on the construction site; It is equipped with a computer and requires a lot of equipment to support the entire system, which is expensive
However, it has some defects: 1. It can only transmit data and 2D pictures instead of an intuitive 3D three-dimensional model, and cannot manage and operate the project site conveniently and intuitively; 2. For personnel in different professional positions, specific data needs to be selected for interactive, relatively inefficient

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • (Building Information Modeling) BIM based plan graph and first view-angle split-screen synchronous display method and system
  • (Building Information Modeling) BIM based plan graph and first view-angle split-screen synchronous display method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047]The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0048] According to the present invention, the BIM-based plan and first-view split-screen synchronous display system includes the following modules:

[0049] The BIM three-dimensional model loading module is used to load and display the BIM three-dimensional model after lightweight processing, including various attributes and data of the BIM model. Preferably, the lightweight processing of the BIM stereo model is realized by introducing a graphics engine to classify and read model pictures and data...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a BIM based plan graph and first view-angle split-screen synchronous display method and system. The method comprises loading and displaying a BIM stereo model; matching a navigation norm with a model bearing; generating a corresponding plane graph and placing a virtual camera; generating a corresponding first-person view-angle graph according to the camera position and view-angle information; displaying the view-angle bearing through the navigation norm visually, and providing a compass function; adjusting the view angle of the first-person view-angle graph according to user instructions, an adjusting the projection view angle direction of the virtual camera in the plane graph according to current view-angle data; and using the plane graph and the virtual camera projection as one portion and the first-person view-angle graph as the other portion to be displayed synchronously in a same screen. By means of the method and the system, a plane drawing and the first-person view-angle stereo graph are combined, the model bearing and the compass are combined, and accordingly, detail members can be observed and searched visually, the site actual engineering member and model member matching problem can be determined visually, construction management is facilitated, the requirement for the personnel technology is reduced, and even general workers can observe, record and search for the detail members according to images displayed on the same screen.

Description

technical field [0001] The invention relates to BIM application technology and IT fields, and is used in intelligent engineering management, in particular to a technology and method for displaying BIM models on a mobile client. Background technique [0002] BIM is Building Information Modeling (Building Information Modeling), as a complete information carrier of construction projects, it is an innovative method of architectural design, construction and management. Its main feature is that it can continuously and instantly provide high-quality, consistent and reliable project design scale, progress and cost information. Architects, structural engineers and the whole process management of engineering projects realize seamless connection and share data and information through the BIM collaborative platform. Use BIM technology to improve refined management and reduce resource consumption and energy consumption. BIM has become an important technical means for the whole process ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50
Inventor 尹仕友严国林
Owner SHANGHAI TONGZHU INFORMATION TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products