Integrated project management system

A project management system and comprehensive technology, applied in data processing applications, resources, calculations, etc., can solve problems such as untimely information, opaque situations, untimely approval, etc., achieve data accuracy and visualization, ensure accuracy, Avoid the effect of information silos

Inactive Publication Date: 2013-01-02
TIANJIN BOXIN AUTOMOBILE PARTS
View PDF3 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0010] The present invention discloses a comprehensive project management system to solve the above problems of inaccurate statistics, untimely information, opaque situation, and untimely approval of the existing project management system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integrated project management system
  • Integrated project management system
  • Integrated project management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] Such as Figure 1-2 As shown, a kind of comprehensive project management system described in the embodiment of the present invention includes several clients and server terminals connected by local area network, and the server terminal is provided with the following systems:

[0033] Progress system: including project progress information display module, project information input module, project progress and status automatic update module and project warning prompt module; where the project executor prepares the project plan, including plan name, start time, plan end time, responsible person, etc. , the corresponding tasks will be displayed on the person in charge. The person in charge enters the task implementation and progress every day, and the progress and status of the project plan are automatically updated and corresponding warning prompts are given; plan approval and plan change approval will be in the module according to the custom process completed.

[0034] C...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an integrated project management system comprising a plurality of clients, a database server and a plurality of functional systems which are all connected through a local area network. The system provided by the invention has the beneficial effects that a project is taken as the base point, so that a user can input the information such as progress plan, cost plan and quality gate into the system from the clients, and store the information in the database of the server end; the system provided by the invention has comprehensive management content and is added with the auxiliary systems of problem, contract, process, transaction, and organizational structure around three systems of progress, cost and quality. The information share, data accuracy and visualization, employee accountability expression, and approval process electronization in the project management controlling process are implemented, and the data accuracy is guaranteed through setting the organizational structure and permission, thereby avoiding the information isolated land caused by the fact that different departments are responsible for different contents.

Description

technical field [0001] The invention relates to the field of information modules, in particular to a comprehensive project management system. Background technique [0002] With the progress of the times and the continuous improvement of enterprise management level, project management, as a branch of management science, gradually developed in the late World War II and became popular all over the world. With the development trend of informatization, the application of project management system is also unstoppable, especially in our country in recent years, the development momentum is very strong. [0003] The vast majority of existing enterprises are involved in a wide variety of projects and complex processes. However, the current project management system is often based on the control of the progress, cost, and quality of the project, and is operated through paper. The progress and status of the project need to be manually recorded and counted, and the relevant work progres...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06
Inventor 焦胜杰汪明星郝建军闫田李万松苏玲赵艳金岩赵冉
Owner TIANJIN BOXIN AUTOMOBILE PARTS
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products