Seismic box type cover structure for building liquefied foundation
A technology for liquefying foundations and buildings, which is applied in construction, infrastructure engineering, protection devices, etc., to achieve obvious effects, convenient construction, and the effect of restraining shear force
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] The anti-seismic box-type cover structure of the liquefied foundation of the building includes a grid-shaped mixing pile box body, and the grid-style mixing pile box box body includes reinforcement piles 1 placed under the foundation of the building's outer wall, placed Protective pile 2 under the foundation of the inner wall of the building, the bottom of the mixing pile box penetrates the liquefied soil layer of the foundation and penetrates into the non-liquefied soil layer, and a reinforcing rib waterproof cushion layer 3 is laid between the foundation surface and the top of the mixing pile box , and the top of the stirring pile box body goes deep into the reinforcing rib waterproof cushion 3; the grid-shaped stirring pile box body also includes a connecting pile 4 between the reinforcement pile 1 and the guard pile 2, and the reinforcement Pile 1 is composed of three rows of cement-soil mixing piles with a diameter of 500mm, the guard pile 2 and connecting pile 4 ar...
Embodiment 2
[0026] The anti-seismic box-type cover structure of the liquefied foundation of the building includes a grid-shaped stirring pile box body, and the grid-shaped stirring pile box box body includes reinforcement piles 1 placed under the foundation of the outer column of the building, placed Protective pile 2 under the column foundation in the building, the bottom of the mixing pile box penetrates the liquefied soil layer of the foundation and penetrates into the non-liquefied soil layer, and a reinforcing rib waterproof cushion 3 is laid between the foundation surface and the top of the mixing pile box , and the top of the stirring pile box casing goes deep into the rib waterproof cushion 3; the grid-shaped stirring pile box casing also includes a connecting pile 4 between the guard pile 2 and the guard pile 2, and the reinforcement Pile 1 is composed of three rows of cement-soil mixing piles with a diameter of 500mm, the guard pile 2 and connecting pile 4 are composed of two row...
Embodiment 3
[0028] The anti-seismic box-type cover structure of the liquefied foundation of the building includes a grid-shaped mixing pile box body, and the grid-shaped mixing pile box box body includes reinforcement piles 1 placed under the foundation of the building's outer wall, placed Protective pile 2 under the column foundation in the building, the bottom of the mixing pile box penetrates the liquefied soil layer of the foundation and penetrates into the non-liquefied soil layer, and a reinforcing rib waterproof cushion 3 is laid between the foundation surface and the top of the mixing pile box , and the top of the stirring pile box body goes deep into the reinforcing rib waterproof cushion 3; Between the connecting pile 4, the reinforcement pile 1 is composed of three rows of cement-soil mixing piles with a diameter of 500mm, and the guard pile 2 and connecting pile 4 are composed of two rows of cement-soil mixing piles with a diameter of 500mm. And the lap length c between adjace...