Unstable formation treatment technique for rock salt well construction
An unstable and stratum technology, applied in wellbore/well components, earthwork drilling, construction, etc., can solve the problems of inability to return to the surface, wellbore gushing, leakage, etc., to improve resource utilization, and widely popularized and applied. Prospects, the effect of protecting the environment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0017] The present invention will be described in further detail below in conjunction with specific examples.
[0018] The rock-salt well construction unstable stratum treatment technology of the present invention, it adopts the isolation of the unstable stratum and cementing twice to complete the drilling and well-forming operation of the unstable rock-salt stratum, so as to achieve the smooth exploitation of the unstable stratum coverage The purpose of lower rock salt deposits, its specific steps are:
[0019] (1) Drilling: Three-cone drilling is used. During the drilling construction process, the pump pressure and current of the mud pump are closely monitored. Under the premise of ensuring that no flushing fluid returns to the ground, the drill bit smoothly passes through the dissolution cavity and reaches the bottom of the salt mine. target layer.
[0020] (2) Isolation technology: After the drilling operation is completed, various casings are lowered to the target produc...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More