Device and method for preparing subway composite contact rail
A composite contact and welding device technology, applied in the direction of power rails, etc., can solve the problems of easy reaction, high cost, and large current loss, and achieve the effects of excellent electrical conductivity, high-efficiency manufacturing, and super-length manufacturing
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] The stainless steel strip 10 is stamped to form a groove 13, and the surface is cleaned and then sprayed with copper powder; the aluminum alloy body 14 is subjected to aging treatment after being extruded, and the surface is cleaned; the stainless steel strip 10 and the aluminum alloy body 14 are assembled together and slowly pushed into the Make the traction device clamp the composite rail and advance at a speed of 5mm / min; start the heating device 6 to heat the composite rail to about 180°C; start the top pressure device 4 to make the pressure of the hydraulic cylinder reach 30kN, and apply pressure to the top of the composite rail; Start the side pressure devices 2 and 5 on the left and right sides, so that the pressure of the hydraulic cylinder reaches 10kN, and apply pressure to the sides to make them compound; start the welding device 8, and realize welding connection to the two sides. After the composite contact rail is sintered at medium temperature and pressure ...
Embodiment 2
[0031] The stainless steel strip 10 is stamped to form a groove 13, and the surface is cleaned and then sprayed with copper powder; the aluminum alloy body 14 is subjected to aging treatment after being extruded, and the surface is cleaned; the stainless steel strip 10 and the aluminum alloy body 14 are assembled together and slowly pushed into the Make the traction device clamp the composite rail and move forward at a speed of 2mm / min; start the heating device 6, heat the composite rail to 200°C; start the top pressure device 4, make the pressure of the hydraulic cylinder reach 35kN, and apply pressure to the top of the composite rail; start The side pressure devices 2 and 5 on the left and right sides make the pressure of the hydraulic cylinder reach 15kN, apply pressure to the sides to make them composite; start the welding device 8, and realize welding connection to the sides. After the composite contact rail is sintered at medium temperature and pressure compounded, the co...
Embodiment 3
[0033] The stainless steel strip 10 is stamped to form a groove 13, and the surface is cleaned and then sprayed with copper powder; the aluminum alloy body 14 is subjected to aging treatment after being extruded, and the surface is cleaned; the stainless steel strip 10 and the aluminum alloy body 14 are assembled together and slowly pushed into the Make the traction device clamp the composite rail and move forward at a speed of 5mm / min; start the heating device 6, heat the composite rail to 220°C; start the top pressure device 4, make the pressure of the hydraulic cylinder reach 30kN, and apply pressure to the top of the composite rail; start The side pressure devices 2 and 5 on the left and right sides make the pressure of the hydraulic cylinder reach 10kN, apply pressure to the sides to make them composite; start the welding device 8, and realize welding connection to the sides. After the composite contact rail is sintered at medium temperature and pressure compounded, the co...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 