Combined type folding dam and construction method thereof
A combined, weir technology, applied in marine engineering, barrage/weir, water conservancy projects, etc., can solve the problems of rubber dam height limitation and impact on application, and achieve automatic control of weir height, good water flow and structure. simple effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] see Figure 1-3, is a kind of combined folding weir of the present invention, has included the folding weir 1 that is built on the river course or mountain stream, has combined folding weir 1 and sand flushing gate 16 along the weir axis on described river course, folding weir 1 and There is a common middle pier 3 between the sand washing gates 16, the A side pier 41 is arranged on the bank of the combined folding weir 1 side, the B side pier 4 is arranged on the river bank of the side of the sand washing gate 16, and the A side pier 41 is connected to the middle pier 41. There is a weir bottom plate 2 on the river bed between the piers 3, and a folded weir body 21 is hinged and fixed on the weir bottom plate 2. One end of the folded weir body 21 is movable against the A side pier 41, and the other end is movable against the middle pier 3. The weir bottom plate 2 There is a bedding 5 on the river bed on the upstream side, and there is a sand guide sill 6 obliquely place...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com