Mounting process for cargo oil deep-well pump

An installation process, deep well pump technology, applied in the field of cargo oil deep well pump installation process, can solve the problems of long installation process, complicated installation process, and many supporting tooling facilities, so as to reduce installation time, shorten manufacturing cycle, and reduce maintenance The effect of the measures

Inactive Publication Date: 2013-07-17
江苏新世纪造船有限公司
View PDF5 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The installation of the general cargo oil deep well pump starts after the ship theme is formed. Various measures need to be considered during the installation process. On the premise of protecting the cargo oil pump, various installation and measurement data are monitored, and there are many supporting tooling facilities for installation. , and the installation accuracy is difficult to control
The installation process of traditional cargo oil deep well pumps is complicated and takes a long time, which leads to delays in the connection and inspection of the deck connection tooling, and finally affects the total berth cycle

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0013] An installation process of a cargo oil deep well pump, which is characterized in that it includes the following steps: (1) using a special tripod to hoist the prosthesis master to the position where it needs to be installed; The installation size of the cargo oil suction area meets the requirements of the drawings; (3) In the cargo warehouse, use the prosthesis model to set and install the middle support of the cargo oil pump; (4) According to the height of the deep well pump on the deck, after adjusting the height of the deck base , to complete deck base welding and deck pipeline connection; (5) to carry out pipeline string washing and tightness test.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a mounting process for a cargo oil deep-well pump. The mounting process comprises the following steps of (1) hoisting a false body templet to a position where the false body templet is required to be mounted by using a special triangular support; (2) regulating a mounting dimension of a cargo oil suction port area in a cargo hold until the mounting dimension meets the drawing requirement according to the drawing size of a deep-well pump; (3) mounting a cargo oil pump middle support by using the false body templet in the cargo hold; (4) regulating the height size of a deck base according to the height size of the deep-well pump on a deck to weld the deck base and connect deck pipelines; and (5) performing pipeline serial washing and tightness test. By the mounting process, the connection of the deck pipelines and the arrangement of the cargo hold deep-well pump middle support are completed in advance, on-site mounting time and protection measures are reduced and a manufacturing cycle is shortened.

Description

[0001] Technical field: [0002] The invention relates to ship building, in particular to an installation process of a deep well pump for cargo oil. [0003] The installation process is mainly for the fast and safe installation and positioning of the largest tonnage chemical tanker cargo oil pump produced by our company. Background technique: [0004] The installation of the general cargo oil deep well pump starts after the ship theme is formed. Various measures need to be considered during the installation process. On the premise of protecting the cargo oil pump, various installation and measurement data are monitored, and there are many supporting tooling facilities for installation. , and the installation accuracy is also difficult to control. The traditional cargo oil deep well pump installation process is complicated, and the installation process takes a long time, which leads to delays in the connection of deck connection tooling and inspection work, and finally affe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B63B9/00
Inventor 徐红忠杜海霞房兴荣蒋江
Owner 江苏新世纪造船有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products