Mounting process for cargo oil deep-well pump
An installation process, deep well pump technology, applied in the field of cargo oil deep well pump installation process, can solve the problems of long installation process, complicated installation process, and many supporting tooling facilities, so as to reduce installation time, shorten manufacturing cycle, and reduce maintenance The effect of the measures
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0013] An installation process of a cargo oil deep well pump, which is characterized in that it includes the following steps: (1) using a special tripod to hoist the prosthesis master to the position where it needs to be installed; The installation size of the cargo oil suction area meets the requirements of the drawings; (3) In the cargo warehouse, use the prosthesis model to set and install the middle support of the cargo oil pump; (4) According to the height of the deep well pump on the deck, after adjusting the height of the deck base , to complete deck base welding and deck pipeline connection; (5) to carry out pipeline string washing and tightness test.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com