Apparatus, system and method for connecting linear light fixtures

The present invention relates to an apparatus for installing a plurality of linear light fixtures. The apparatus of the present invention uses male connector and female electrical connectors and reduces on-site installation time and labor. The male connectors are positioned in a detachable housing unit that is connected to at least one light fixture to form a light fixture assembly which may be assembled off-site. The female connectors are retained in a connector bracket that forms part of a top cover assembly which is coupled to the electrical circuitry of the building structure on-site. The male-and-female connectors are thus manually connected on-site without the use of tools, thereby requiring only one on-site electrical connection from the female connectors within the top cover assembly to the power source of the building structure.
Owner:BEGHELLI NORTH AMERICA CORP

Bridge high-tower construction method and construction equipment thereof

The invention provides a bridge high-tower construction method, and belongs to the technical field of road and bridge construction. The bridge high-tower construction method comprises the steps that an initial segment of a tower column and a second section of the tower column and a third section of the tower column are constructed, then a climbing formwork body is installed on the tower column, alower tower column and a middle tower column are constructed, a fourth section of the tower column and above parts adopt climbing formwork construction, and the outer side of the climbing formwork body is totally sealed. The fourth section of the tower column and above parts adopt climbing formwork construction, punched steel meshes are used for totally sealing the outer side of the climbing formwork body, the sealed environment enables the internal operation environment of a climbing formwork to be significantly improved, and normal operation such as tower column reinforced steel bar bindingand concrete pouring in strong-wind weather is ensured. The invention further provides construction equipment used for the bridge high-tower construction method.
Owner:CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD

Solar photovoltaic module tracking device and installing method thereof

The invention relates to a photovoltaic tracker, in particular to a solar photovoltaic module tracking device and an installing method of the solar photovoltaic module tracking device. The solar photovoltaic module tracking device comprises stand columns, a main shaft is arranged between every two adjacent stand columns and provided with a photovoltaic module, every two adjacent main shafts are connected through a connecting shaft, the connecting shafts are fixed to the stand columns, the upper end face of each stand column is a stand column installing face, a through hole is formed in the upper portion of each stand column, and one connecting shaft is arranged in each through hole through a bearing structure. The through holes are formed in the stand columns, the connecting shafts are installed in the through holes through the bearing structures, and after pre-installation, a whole stand column combination is hammered in through a pile driver. The solar photovoltaic module tracking device is convenient to install, simple in structure and capable of reducing field installation difficulty and requirements, the installing method can shorten the installing period and reduce cost, and the technical problems that in the prior art, a photovoltaic module tracker has many components, the installing period is long, field installation is very difficult, and field installation is demanding are solved.
Owner:VERSOLSOLAR HANGZHOU

Mounting process for cargo oil deep-well pump

The invention discloses a mounting process for a cargo oil deep-well pump. The mounting process comprises the following steps of (1) hoisting a false body templet to a position where the false body templet is required to be mounted by using a special triangular support; (2) regulating a mounting dimension of a cargo oil suction port area in a cargo hold until the mounting dimension meets the drawing requirement according to the drawing size of a deep-well pump; (3) mounting a cargo oil pump middle support by using the false body templet in the cargo hold; (4) regulating the height size of a deck base according to the height size of the deep-well pump on a deck to weld the deck base and connect deck pipelines; and (5) performing pipeline serial washing and tightness test. By the mounting process, the connection of the deck pipelines and the arrangement of the cargo hold deep-well pump middle support are completed in advance, on-site mounting time and protection measures are reduced and a manufacturing cycle is shortened.
Owner:江苏新世纪造船有限公司

Light partition wall

The invention discloses a light partition wall which comprises unit brickworks (1), a fastener screw cap (2), a fastener bolt (3), an assembled fastener body (4) and an I-shaped metal frame (5), wherein the assembled fastener body (4) is a T-shaped structural part, a hole is arranged on the assembled fastener body (4), the fastener screw cap (2) is provided with an inner wire per se, the screw cap (2) and the fastener bolt (3) are matched with each other to fix the assembled fastener body (4) onto the I-shaped metal frame (5) so as to form into a plurality of spaces capable of independently containing the unit brickworks (1), and the plurality of unit brickworks (1) are filled into the spaces to form the light partition wall. The screw cap (2) and the fastener bolt (3) are matched with each other to be fixed on the I-shaped metal frame (5) so as to form a hooking and fastening end, and the assembled fastener body (4) is hooked and fastened to the hooking and fastening end through the hole on the assembled fastener body. According to the light partition wall, the cyclic utilization rate of the material can be improved, the facing construction difficulty on the surface of the light partition wall can be reduced, and the common quality problems of the conventional gypsum brickwork can be avoided.
Owner:GOLD MANTIS CONSTR DECORATION

Platform-based transformer lead wire manufacturing platform

ActiveCN107134357APrecise peeling distancePeel Distance SpecificationsLine/current collector detailsInductances/transformers/magnets manufactureState of artTransformer
The invention discloses a platform-based transformer lead wire manufacturing platform, which is used for solving the technical problems that in the prior art, the working procedure of the transformer lead wire aerial work is troublesome and time-consuming, the work efficiency is low, work high above the ground is difficult, and the like. The platform-based transformer lead wire manufacturing platform comprises an operating platform, wherein an insulating layer stripping device, a binding wire manufacturing device, a lead wire radian manufacturing device and an insulator and wire clamp assembling device are arranged on the operating platform; the insulating layer stripping device comprises a lead wire fixing support and a moving ruler; the binding wire manufacturing device comprises a binding wire winder and a binding wire seat; the lead wire radian manufacturing device comprises a lead wire bending device and a lead wire shaping device which are fixedly connected with the operating platform; the insulator and wire clamp assembling device comprises an insulator fixing support, a lightning arrester fixing support, a moving support and a rear support which are fixedly connected with the operating platform. According to the platform-based transformer lead wire manufacturing platform provided by the invention, the work amount and the work strength of the work high above the ground are reduced, and the work efficiency is greatly improved.
Owner:PUYANG POWER SUPPLY COMPANY STATE GRID HENAN ELECTRIC POWER +2

Multifunctional finished product comprehensive supporting and hanging bracket for suspended ceiling

PendingCN110332372AGuaranteed artistic beautyFast constructionPipe supportsCeilingsFloor slabWork in process
The invention provides a multifunctional finished product comprehensive supporting and hanging bracket for a suspended ceiling. The multifunctional finished product comprehensive supporting and hanging bracket for the suspended ceiling comprises a structural floor slab and a supporting and hanging bracket body fixedly arranged on the lower surface of the structural floor slab, and the supporting and hanging bracket body comprises two vertical pipes, a first-layer transverse pipe connected between the two vertical pipes in a crossing manner and a second-layer transverse pipe which is connectedbetween the two vertical pipes in a crossing manner and located over the first-layer transverse pipe; and the supporting and hanging bracket body is fixedly provided with multiple fixing brackets, multiple pipe clamps and a pipe hanger used for fixing a condensation water pipe. According to the multifunctional finished product comprehensive supporting and hanging bracket for the suspended ceiling,vibration and noise can be reduced, the field installing time is shortened, field semi-finished product assembling can be achieved, and the field narrow space is reasonably utilized; and in addition,safety and durability are achieved, potential safety hazards brought when a traditional supporting and hanging bracket conducts welding construction on the field are reduced, the fastness of the multifunctional finished product comprehensive supporting and hanging bracket is guaranteed, and the aesthetic feeling pursued at the beginning of design is achieved.
Owner:GOLD MANTIS CONSTR DECORATION

Variable-volume deep-sea butterfly-shaped net cage and regulation and control method thereof

The invention discloses a variable-volume deep-sea butterfly-shaped net cage and a regulation and control method thereof. A central column sequentially penetrates through the middles of an upper butterfly-shaped net cage and a lower butterfly-shaped net cage, the upper butterfly-shaped net cage and the lower butterfly-shaped net cage are symmetrically arranged, the opposite ends of the upper butterfly-shaped net cage and the lower butterfly-shaped net cage are connected to the end parts of the central column through an upper flange plate and a lower flange plate respectively, the opposite ends of the upper butterfly-shaped net cage and the lower butterfly-shaped net cage are rotationally connected to the middle of the central column correspondingly, the periphery is connected through multiple pins, the upper flange plate and the lower flange plate are correspondingly connected to a signal collector, an underwater power generation traction platform is connected to the lower flange plate, a control system is installed on the underwater power generation traction platform and is in signal connection with the underwater power generation traction platform, and the upper butterfly-shaped net cage, the lower butterfly-shaped net cage and the signal collector are correspondingly in signal connection with the underwater power generation traction platform and the control system. According to the variable-volume deep-sea butterfly-shaped net cage and the regulation and control method thereof, damage caused by collision among rod pieces due to impact force of wave motion can be effectively avoided, a large amount of labor force can be saved, safety accidents caused by underwater work of workers in a severe environment are avoided, and response can be made in time in the sudden change environment, and damage to the net cages is avoided.
Owner:JIANGSU UNIV OF SCI & TECH

Supporting and heat insulation integrated heat preservation cylinder and preparation method thereof

The invention provides a supporting and heat insulation integrated heat preservation cylinder and a preparation method thereof, wherein the heat preservation cylinder comprises an inner-layer cylinder body with the density of 1.1-1.6 g / cm<3> and an outer-layer cylinder body with the density of 0.12-0.22 g / cm<3>, wherein the outer side surface of the inner-layer cylinder body is connected with the inner side surface of the outer-layer cylinder body through pyrolytic carbon. The preparation method comprises the steps: S1, preparing the inner-layer cylinder body; S2, preparing the outer-layer cylinder body outside the inner-layer cylinder body, wherein the density of the outer-layer cylinder body is smaller than that of the inner-layer cylinder body; and S3, carrying out chemical vapor infiltration treatment on the inner-layer cylinder body and the outer-layer cylinder body, and preparing the heat preservation cylinder. The heat preservation cylinder prepared by the method is stable in structure, good in heat preservation effect and easier to connect with a graphite carbon felt compared with a conventional heat preservation cylinder, the preparation process of a heat preservation cover can be simplified, and rapid mounting and dismounting of the heat preservation cylinder and the graphite carbon felt are facilitated.
Owner:成都裕鸢航空智能制造股份有限公司

Connective building material and combined part used therewith

ActiveCN104251248AFirm standing supportStand firmCeilingsElongated constructional elementsGusset plateLap joint
The invention relates to connective building material comprising at least one protruding tube. The outer end of each protruding tube is provided with a hollow hole; the longitudinal section of the hollow hole is cross shaped. Each protruding tube comprises an upper protrusion, a left protrusion, a right protrusion and a lower protrusion. Two sides of each upper protrusion are connected with one side of the corresponding left protrusion and one side of the corresponding right protrusion, respectively. Two sides of each protrusion are connected with the other side of the corresponding left protrusion and the other side of the corresponding right protrusion, respectively. A first lap joint position is formed between each upper protrusion and the corresponding left protrusion; a second lap joint position is formed between each upper protrusion and the corresponding the right protrusion; a third lap joint position is formed between each lower protrusion and the corresponding left protrusion; a fourth lap joint position is formed between each lower protrusion and the corresponding right protrusion. The connective building material is applicable to mesh ceilings, and field installation time is greatly shortened. The connective material is also applicable to wardrobes, assembly is facilitated, support layers can be fastened via gusset plates, and greater weight can be supported. The connective building material is applicable to assembled desks, and the assembled desks can be quickly assembled. The connective building material is also applicable to partition walls, and a room can be quickly partitioned.
Owner:PUTIAN COURTYARD CULTURE MEDIA

Automatic installing method of curtain wall plate robots

InactiveCN110821113AReduce positioning processReduce on-site installation timeWallsMechanical engineeringRobot
The invention discloses an automatic installing method of curtain wall plate robots. The curtain wall plate robots work according to the following steps that a construction tool is positioned on the site through a total station; keels are cut by the robots, the cut keels are positioned on a wall face to be installed, and the keels comprise transverse keels and longitudinal keels; the robots punchstone curtain wall plates according to the outlines of the stone curtain wall plates; back bolt screws and hangers are installed on the punched stone curtain wall plates; the robots convey the stone curtain wall plates to the designated positions to be installed; the total station scans the wall face outline and acquires the irregular gap outline of the wall face; the keels and the stone curtain wall plates continue to be installed according to the irregular gap outline of the wall face; and the robots comprises a first robot and a second robot. According to the automatic installing method ofthe curtain wall plate robots, the total station is used for robot positioning in the site curtain wall plate installing process, the higher positioning precision, the shorter positioning time and thelow cost are achieved, installation of curved-surface and special-shaped complex wall face curtain wall plates is facilitated, and the automatic installing method of the curtain wall plate robots issuitable for large-scale popularization.
Owner:TONGJI UNIV

Lengthening joint containing prefabricated concrete-filled steel tube core column component and construction method of lengthening joint

The invention discloses a lengthening joint containing a prefabricated concrete-filled steel tube core column component and a construction method of the lengthening joint. The lengthening joint comprises an upper-section core column, a lower-section core column, a steel reinforcement framework, a joint concrete layer and out-of-tube concrete layers. The bottom end of the upper-section core columnis connected with an upper flange plate, the top end of the lower-section core column is connected with a lower flange plate, a connecting assembly comprises a connecting plate, bonding glue layers and high-strength bolts, the connecting plate is arranged between the upper flange plate and the lower flange plate, air holes are formed in the middle of the plate face of the connecting plate at intervals, the bonding glue layers are arranged between the connecting plate and the upper flange plate and between the connecting plate and the lower flange plate, and the upper-section core column and the lower-section core column are connected through the high-strength bolts; and the steel reinforcement framework is arranged around joints of the upper-section core column and the lower-section core column, and the joint concrete layer is poured between the out-of-pipe concrete layer on the outer side of the upper-section core column and the out-of-pipe concrete layer on the outer side of the lower-section core column. The technical problems that the thickness of an existing joint cannot be adjusted, inclination deviation exists, compression deformation is large, force transmission is not reliable, construction efficiency is low, and concrete in a steel pipe is difficult to pour are solved.
Owner:CHINA AVIATION PLANNING & DESIGN INST GRP

Novel gravity multi-disc thickener

ActiveCN112522980AImprove filtration and concentration efficiencyLarge filter areaPulp de-wateringProcess efficiency improvementCircular discEngineering
The invention discloses a novel gravity multi-disc thickener. The thickener comprises a tank body and a hollow main shaft mounted on the tank body, and a plurality of filter discs are arranged on thehollow main shaft; an upper cover is arranged above the tank body in a covering manner, and a spraying device is arranged at the upper cover; and a feeding hopper and a discharging hopper are oppositely arranged on two sides of the hollow main shaft of the tank body; and filtrate outlet boxes are respectively arranged at two axial ends of the hollow main shaft. Each filter disc comprises a plurality of fan-shaped filter frames, and filter screens cover the fan-shaped filter frames; each fan-shaped filter frame comprises a fan-shaped frame consisting of an outer arc plate, an inner arc plate and two support rods arranged along the radial direction, grid plates are symmetrically arranged on two axial sides of the fan-shaped frame respectively, and filter screens cover the grid plates; the axial width of the outer arc plate is smaller than that of the inner protection plate, so that the two grid plates get close to the center in the direction from the inner arc plate to the outer arc plate, and a frustum-shaped section structure with a small outer end and a large inner end is formed. The thickener is compact in structure, efficient and reliable in dehydration effect, large in effective dehydration area and easy to operate.
Owner:ZHENGZHOU LEIZHAN TECH PAPER MACHINERY

Two-storey foldable box type house

InactiveCN109610643AEnhanced waterproof and windproof performanceSimple structureBuilding insulationsEngineeringWall plate
The invention discloses a two-storey foldable box type house. The two-storey foldable box type house comprises a bottom frame (1), a middle frame (2) and a top frame (3), side plates which can be folded inwards are arranged on the left side and the right side between the bottom frame (1) and the middle frame (2) and the left side and the right side between the middle frame (2) and the top frame (3), and front gable plates and back gable plates which can be folded inwards are correspondingly arranged on the front side and the back side between the bottom frame (1) and the middle frame (2) and the front side and the back side between the middle frame (2) and the top frame (3). According to the two-storey foldable box type house, in a folded state, the side plates are folded inwards to form upper side plates and lower side plates which are superimposed up and down, the front gable plates and back gable plates are folded inwards under the same-layer folded side plates, and thus the foldingof the two-storey box type house is realized, and the transportation and storage are facilitated; and also, water-stop structures are arranged at joints among the bottom frame (1), the middle frame (2), the top frame (3), the side plates on the left side and the right side, the front gable plates and the back gable plates, and the waterproof and windproof effects of the box type house are enhanced.
Owner:深圳雅致集成房屋有限公司

Installation method for overhaul security fence

The invention provides an installation method for an overhaul security fence. The method comprises the following steps of: 1) perforating an installation hole according to a design requirement; 2) positioning and installing an upright post sleeve by using a positioning explorator; and 3) installing and assembling groups of upright posts and railings into the upright post sleeve to quickly install the overhaul security fence on site. The railings and the upright posts in the method are grouped in a factory, with high installation precision and high production efficiency; the installation holes on the railings or the upright posts are circular holes, so the connection rigidity is high and anti-impact capability is high. During on-site construction, the railings and the upright posts can be directly inserted into the upright post sleeve to be fastened, and the respective grouped railings and upright posts are connected together, so the on-site installation time is saved, the severe environment has small influence on the installation, and the whole appearance is attractive and standard.
Owner:CHINA THREE GORGES CORPORATION

Rapid transporting device for underground single hydraulic prop and transporting method finished thereof

The invention belongs to the technical field of coal-mine underground single hydraulic-prop transportation, particularly relates to a rapid transporting device for an underground single hydraulic prop and a transporting method finished by the rapid transporting device and solves the problems of great worker labor intensity and difficult safety guarantee of traditional single hydraulic-prop support. The device comprises a plurality of main-wheel groups, a driving-wheel group, a chain, a plate-bending assembly and a track. According to the transporting method, a double-end closed-type railway is adopted, and the plurality of main-wheel groups can be recycled in the processes of hanging a transporting railway and transporting the single hydraulic prop, so that the rapid transportation of the single hydraulic prop is realized. According to the transporting device and the transporting method, the requirement on the rapid transportation of the single hydraulic prop at a mining area can be met; in addition, the time and the labor are saved, the labor intensity of workers is lowered, the auxiliary time is shortened, the safety is improved, and the production efficiency of a fully-mechanized coal-mining surface is improved.
Owner:TAIYUAN INST OF CHINA COAL TECH & ENG GROUP +1

Semi-modular rotor module

A semi-modular rotor module (60) for an air preheater (10) having a circular rotor includes a lug assembly (62) having a lug front (80), a lug back (86) spaced radially outward from the lug front (80). A single main diaphragm (64) extends radially from an inner end portion to an outer end portion, with the inner end portion being mounted to the lug front (80) on a first side of the lug assembly (62). The outer end portion is mounted to a rotor shell (66) whish is spaced radially from the lug back (86). At least one intermediate diaphragm (78) extends radially from an inner end portion, mounted to the lug back (86) at a position intermediate the first and second sides of the lug assembly (62), to an outer end portion mounted to the rotor shell (66).
Owner:ARVOS INC

A solar photovoltaic module tracking device and installation method thereof

The invention relates to a photovoltaic tracker, in particular to a solar photovoltaic component tracking device and an installation method thereof. Including the column, there is a main shaft between two adjacent columns, and a photovoltaic module is arranged on the main shaft, and the two adjacent main shafts are connected by a connecting shaft, and the connecting shaft is fixed on the column, and the upper end surface of the column is the mounting surface of the column. A through hole is opened on the upper part of the shaft, and a connecting shaft is installed in the through hole through a bearing structure. A through hole is opened on the column, and the connecting shaft is installed through the bearing structure in the through hole. After pre-installation, the entire column combination is driven in by a pile driver. The invention provides a convenient installation, a simple structure, and A solar photovoltaic module tracking device and installation method that reduces the difficulty and requirements of on-site installation, shortens the installation period and cost; solves the problem that the photovoltaic module tracker in the prior art has many components, a long installation period, and high difficulty in on-site installation. Installation requires many technical issues.
Owner:VERSOLSOLAR HANGZHOU

Modular high-power off-board charger

The invention relates to the technical field of automobile charging, in particular to a modular high-power off-board charger. The charger comprises an alternating current module, a direct current module, a rectification module and a wiring harness module, the alternating current module is provided with an alternating current module connector, the direct current module is provided with a direct current module connector, the rectification module is provided with a rectification module connector, the wiring harness module is provided with an alternating current wiring harness connector in butt joint with the alternating current module connector, a direct current wiring harness connector in butt joint with the direct current module connector and a rectification wiring harness connector in butt joint with the rectification module connector, and the alternating current wiring harness connector, the direct current wiring harness connector and the rectification wiring harness connector are electrically connected in the wiring harness module. The modular high-power off-board charger provided by the invention not only can be installed on site by a single person, but also does not need wiring during installation, and is convenient and fast to install.
Owner:JIANGSU WANBANG DEHE NEW ENERGY TECH CO LTD +1

Full-surrounding type refrigerator protection device and packaging method

The invention discloses a full-surrounding type refrigerator protection device and a packaging method, and relates to the technical field of refrigerator packaging. The full-surrounding type refrigerator protection device comprises an air column bag formed by heat sealing of two layers of films, wherein first heat sealing lines are formed along the edges of the two layers of films; the air column bag is of a rectangular structure, and a rectangular annular structure matched with the periphery of a refrigerator is formed between the head and the tail of the air column bag through heat sealing; a single-layer air column film is fixed on the edge of an opening in one end formed by connecting the air column bag end to end through heat sealing, so that a semi-sealed space with an opening in one end is formed; the inside of the semi-sealed space formed by the single-layer air column film and the air column bag is sleeved with the refrigerator; and a plurality of mutually parallel and mutually independent air columns are formed in the air column bag through second heat sealing lines. According to the full-surrounding type refrigerator protection device, the interior of the semi-sealed space formed by the single-layer air column film and the air column bag is sleeved with the refrigerator, a PE film protective cover and a four-side strip protective plate are replaced, the operation procedures are reduced, the operation time is shortened, and the operation difficulty is reduced.
Owner:CHANGHONG MEILING CO LTD

Field installable fiber optic connector

A field installable fiber optic connector is formed without the need to splice two opposing optical fibers together. A ferrule flange assembly with one or more crimp zones secures an optical fiber therein. The assembly is secured within a plug frame housing that has a bias spring, both secured therein by an extender cap. A cable retainer with at least two wings secures the optical cable when a retainer nut is screwed onto a backpost of the extender cap.
Owner:SENKO ADVANCED COMPONENTS

Bridge stand column support-free construction method

A bridge stand column support-free construction method comprises the steps: processing of a stand column reinforcement cage: the stand column reinforcement cage is machined through a reinforcement cage jig frame; measuring the pre-embedded position of the stand column: lofting the direction line of the outer side line of the stand column onto a bearing platform template, and pulling out the central outline of the stand column by using a fine line to serve as a reference line of a stand column pre-embedded reinforcement cage; and integrally hoisting the stand column reinforcement cage: inserting the reinforcement cage into the bearing platform and not installing opposite-pull hook ribs and inner stirrups of the part above the bearing platform surface, binding the part of steel bars insertedinto the bearing platform after the stand column reinforcement cage is hoisted in place and fixed, and mounting the opposite-pull hook ribs and the inner stirrups within the range of the part above the bearing platform surface after a concrete surface is roughened and cleaned. Compared with the prior art, centralized modular machining, manufacturing and mounting of steel bars are achieved, the reinforcing steel bar machining jig frame and the reinforcing steel bar end positioning frame are used for machining the bridge stand column reinforcing cage in a workshop, and the reinforcing steel barpositioning precision and machining efficiency are improved; and traditional scaffold erecting and formwork erecting procedures are combined, and scaffold-formwork integration is adopted.
Owner:ZHEJIANG COMM CONSTR GRP CO LTD

Smart numerically controlled pipeline oil heater

The invention belongs to the field of industrial equipment and particularly relates to a smart numerically controlled pipeline oil heater which comprises an automatic controller and a plurality of sets of heating apparatuses. Each heating apparatus comprises a medium-high frequency power supply, a conductive coil and a plurality of sets of paired temperature sensors, wherein the output end of themedium-high frequency power supply is electrically connected with the conductive coil. The automatic controller comprises a signal processing unit and a power supply control unit. The output ends of the temperature sensors are connected with the input end of the signal processing unit. The output end of the signal processing unit is connected with the input end of the power supply control unit. The output end of the power supply control unit is connected with the medium-high frequency power supply so that the medium-high frequency power supply can be controlled to be started or stopped. The smart numerically controlled pipeline oil heater can achieve non-invasive pipeline heating and flow measurement independently or simultaneously, and has the advantages of low energy consumption, high adaptability and reliable performance.
Owner:西安锐步石油科技有限公司

High-pressure module for supercritical 350MW three-cylinder steam turbine

The invention relates to a high-pressure module, in particular to a high-pressure module for a supercritical 350MW three-cylinder steam turbine. The problems that an existing high-pressure module of a three-cylinder steam turbine is complex in steam inlet structure, high in weight and low in cylinder efficiency, thermal expansion of an inner cylinder split flange is uneven, and field installation is inconvenient are solved. Two high-pressure main steam adjusting combination valves are directly connected with a high-pressure outer cylinder through flanges, a high-pressure inner cylinder is installed in the high-pressure outer cylinder, a high-pressure rotor is rotatably installed in the high-pressure inner cylinder, the end of the high-pressure inner cylinder is connected with a high-pressure inner cylinder positioning plate through bolts, a high-pressure outer cylinder positioning plate is connected with the end of the high-pressure outer cylinder through bolts, a high-pressure cylinder adjusting end steam seal and a high-pressure cylinder electric end steam seal are installed on the two sides of the high-pressure outer cylinder respectively, a high-pressure steam supplementing valve is installed on each high-pressure main steam adjusting combination valve, one end of each steam supplementing guide pipe is connected with a corresponding high-pressure steam supplementing valve, and the other end of each steam supplementing guide pipe is connected with a connecting pipe structure of the high-pressure outer cylinder. The invention is used in the supercritical 350MW three-cylinder steam turbine.
Owner:济宁华源热电有限公司 +1

Modularized ship ballast water treatment system

The invention relates to a modularized ship ballast water treatment system. The modularized ship ballast water treatment system comprises a mainframe cabinet, a power distribution cabinet, a control cabinet, a filter control box, a detection cabinet, a filter, an EUT electrocatalysis device, an EUT power source, an electromagnetic flowmeter, a valve and a remote control cabinet, wherein the control cabinet is connected with the remote control unit; the mainframe cabinet is provided with a vertical separator; the filter control box, the filter and the valve are arranged at one side of the vertical separator and mounted in the mainframe cabinet from top to bottom; the power distribution cabinet, the control cabinet and the detection cabinet are orderly mounted on the upper part of the other side of the vertical separator; the EUT power source is mounted under the detection cabinet; the EUT electrocatalysis device and the electromagnetic flowmeter are connected with each other and mounted on a mainframe cabinet base plate on the lower part of the power distribution cabinet; the EUT electrocatalysis device is connected with the inlet of a filter by use of a vertical U-shaped pipeline. The ship ballast water treatment system is designed modularly, and is reasonable in layout, compact in structure, small in volume, convenient to mount, high in integrity and automation degree, low in energy consumption, and is advantageous for saving the cabin space and for energy conversation and consumption reduction.
Owner:QINGDAO HEADWAY TECH

Pipeline protecting device based on temporary beam

The invention relates to a pipeline protecting device based on a temporary beam. The pipeline protecting device is applied to the technical field of railway construction. The key point of the technical scheme is as follows: the pipeline protecting device comprises the temporary beam. A material frame extending in a length direction of the temporary beam is connected to the side wall of the temporary beam, an end cover for closing a lower frame port is hinged to the bottom of the material frame, and a limiting part for limiting rotation of the end cover is arranged on the material frame. A material guide plate extending upward obliquely is arranged at the upper frame port of the side, far away from the temporary beam, of the material frame, a plurality of supporting racks distributed in a spaced manner in the length direction of the material frame are arranged on the ground, two ends of each supporting rack in a height direction are rotatably connected to center shafts, the two center shafts are provided with a plurality of symmetrically distributed synchronizing wheels, and opposite two synchronizing wheels are connected by a synchronizing belt. The pipeline protecting device has the advantages that pipelines are stored in a protecting box, so that a condition that the pipelines are damaged in actual construction is reduced, and meanwhile, the protecting box which takes the temporary beam as a carrier combines the temporary beam with pipeline protection, so that the pipeline protecting device is convenient and flexible.
Owner:中铁二十四局集团江苏工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products