Bridge high-tower construction method and construction equipment thereof

A construction method and technology of construction equipment, applied in bridge construction, bridges, bridge materials, etc., can solve the problems of difficult construction and high operation risks

Inactive Publication Date: 2019-07-23
CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD
View PDF10 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a bridge tower construction method and its construction equipment to solve the technical problems of difficult bridge construction and high operation risk in the harsh marine environment in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge high-tower construction method and construction equipment thereof
  • Bridge high-tower construction method and construction equipment thereof
  • Bridge high-tower construction method and construction equipment thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0035] The invention provides a bridge tower construction method, such as Figure 1-3 As shown, the high tower of the bridge includes a tower column, a lower beam 21 and an upper beam 22, and the tower column includes a lower tower column 11, a middle tower column 12 and an upper tower column 13, and the upper tower column 13 has a main tower...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a bridge high-tower construction method, and belongs to the technical field of road and bridge construction. The bridge high-tower construction method comprises the steps that an initial segment of a tower column and a second section of the tower column and a third section of the tower column are constructed, then a climbing formwork body is installed on the tower column, alower tower column and a middle tower column are constructed, a fourth section of the tower column and above parts adopt climbing formwork construction, and the outer side of the climbing formwork body is totally sealed. The fourth section of the tower column and above parts adopt climbing formwork construction, punched steel meshes are used for totally sealing the outer side of the climbing formwork body, the sealed environment enables the internal operation environment of a climbing formwork to be significantly improved, and normal operation such as tower column reinforced steel bar bindingand concrete pouring in strong-wind weather is ensured. The invention further provides construction equipment used for the bridge high-tower construction method.

Description

technical field [0001] The invention belongs to the technical field of road and bridge construction, and in particular relates to a bridge tower construction method and construction equipment. Background technique [0002] With the construction of basic projects in our country, the field of bridge construction has gradually extended to the ocean. The offshore construction area is often windy and accompanied by typhoons, and the construction environment is extremely harsh. However, the scope of bridge construction in my country is mostly across rivers and inland connections. For the marine environment with frequent windy weather, there is not much experience in the construction of bridges and towers, and it is still in the exploratory stage. [0003] Offshore bridges have large spans, and most of them are high towers. The wind pressure increases with height, which makes the construction of high piers and high towers difficult and risky. At present, there is not much experien...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00E01D101/26
CPCE01D21/00E01D2101/26
Inventor 龚金才刘科赵炜刘自明张红心王东辉肖世波邓永锋袁灿钱玉山李鑫廖远胡吉星
Owner CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products