Pneumatic transport facility for chlorine bypass dust, and cement kiln exhaust gas treatment system equipped with the facility
A pneumatic conveying and waste gas treatment technology, applied in the field of cement kiln waste gas treatment system, can solve problems such as pipeline blockage, water spray nozzle corrosion in the mill, temperature fluctuation at the mill outlet, etc., and achieve the effect of reducing blockage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0067] Make figure 1 The cement kiln exhaust gas treatment system in the embodiment is started for one week under the following operating conditions.
[0068]
[0069] (1) Cement kiln exhaust gas at the inlet of the exhaust pipe 702:
[0070] -Temperature: 900~1100℃,
[0071] -Atmospheric pressure dew point: 60~69℃
[0072] - Air volume: 150[m 3 N / min]
[0073] (2) Air for cooling and dehumidification:
[0074] -External air (temperature: 2 to 16°C, atmospheric dew point: -5 to 11°C)
[0075] - The air volume sent by the blower to the exhaust pipe 702: 250 [m 3 N / min]
[0076] -The air volume sent by the blower to the cooler 705: 320[m 3 N / min]
[0077] (3) The gas flow rate at the outlet of the exhaust pipe 702: 15m / s
[0078] (4) Cement kiln waste gas flowing into inlet 101:
[0079] -Gas temperature: 58~82℃
[0080] -Atmospheric pressure dew point: 30~39℃
[0081] (5) Dust collector 103 of the first dust collection tank 100: bag filter
[0082] (6) Whether t...
Embodiment 2
[0106] In the same manner as in Example 1, except that the operating conditions were changed as follows, figure 1 The cement kiln exhaust gas treatment system in the embodiment started for one week.
[0107]
[0108] (1) Air for cooling and dehumidification:
[0109] -External air (temperature: 2 to 16°C, atmospheric dew point: -5 to 11°C)
[0110] - The air volume sent by the blower to the exhaust pipe 702: 100 [m 3 N / min]
[0111] - The air volume sent by the blower to the cooler 705: 100[m 3 N / min]
[0112] (2) The gas velocity at the outlet of the exhaust pipe 702: 6m / s
[0113] (3) Cement kiln waste gas flowing into inlet 101:
[0114] -Gas temperature: 230~270℃
[0115] -Atmospheric pressure dew point: 43~52℃
[0116] (4) Gas temperature in the pressurized tank 200: 65-98°C
[0117] As a result of starting the cement kiln exhaust gas treatment system under the above operating conditions, there is almost no dust adhesion on the first pipeline 105 , the pressurize...
PUM
Login to View More Abstract
Description
Claims
Application Information