A Synchronization Method for Performance of Train Operation Control System
A train operation control and train technology, applied in railway signaling and safety, etc., can solve problems such as the performance degradation of the train operation control system
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Figure 4 It is a flowchart of a method for improving the performance of a train operation control system. Such as Figure 4 As shown, a method for improving the performance of a train operation control system provided by the invention comprises:
[0039] Step 1: At the beginning of the k period, the regional controller receives the status information of all trains in the jurisdiction area at the current moment; where k is an integer and k≥2. Wherein, the status information includes the position of the tail of the train and the speed of the train.
[0040] Such as Figure 5 As shown, the control system composed of n (n≥2) trains in the area under the jurisdiction of the regional controller, train 1 (T-1) is the first train, train 2 (T-2) is the second train, train n (T-n ) for the tail car. l 1 , l 2 ,...,l n are the lengths of T-1, T-2,..., T-n respectively. Respectively, the position of the end of the k-th cycle start time T-1, T-2, ..., T-n. are the speed...
Embodiment 2
[0069] Such as Figure 6 As shown, the control system consists of 3 trains, train 1 (T-1) is the first train, train 2 (T-2) is the middle train, and train 3 (T-3) is the tail train. l 1 , l 2 , l 3 They are the lengths of T-1, T-2, and T-3 respectively. Respectively, the position of the end of the k-th cycle start time T-1, T-2, T-3. They are the speeds of T-1, T-2, and T-3 at the beginning of the k-th cycle, respectively. is the distance from the tail of T-2 to the tail of T-1, is the distance from the tail of T-3 to the tail of T-2,
[0070] In the CBTC system, the time of the train and the regional controller is strictly synchronized, and the sampling period T of the train state is very short. The three-train control system can be regarded as a discrete linear non-time-varying system. Using the method of state space, the three-train control system is expressed as:
[0071] X k ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com